CITB Heating and Plumbing Services: Pressure systems, pipework and hot work practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

40 of our 200 CITB HS&E Specialist Test: Heating and Plumbing Services (CITB-SPEC-HAPS) questions are on pressure systems, pipework and hot work, about 20% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Which best describes hot work?

Show answer

Answer: D. Any process giving off flame, sparks or heat

  • Hot work is any process that generates flame, sparks or heat.
  • Examples: brazing, soldering, oxy-fuel cutting, grinding and heat guns.

Hot work should be designed out where practicable.

Why the others are wrong:

A: hot work can be anywhere.

B: temperature alone is not the definition.

C: hot work is much wider than welding.

Memory trick:

Flame, spark or heat: it is hot work.

Find it in the book

HSE HSG168 (3rd edition, 2022), page 24

Reg HSE HSG168 (3rd edition, 2022), paragraph 118

Q2. A vessel has two relief valves and you need to remove one for testing. What must you check?

Show answer

Answer: B. The other valve alone gives full relief capacity

  • When isolating one of multiple relief devices, the remaining device(s) must provide the full capacity required.
  • With a single relief device, a replacement should be fitted immediately.

The vessel must never be left unprotected.

Why the others are wrong:

A: fill level is not the test.

C: a gauge reading does not prove relief capacity.

D: one can be removed if the other gives full capacity.

Memory trick:

Take one out, the rest must cope.

Find it in the book

HSE L122 (2nd edition, 2014), page 44

Reg HSE L122 (2nd edition, 2014), guidance para 158

Q3. A 50 mm service pipe feeds a three-storey office. What must be provided with the incoming pipework to the floors?

Show answer

Answer: B. An accessible valve and a permanent line diagram

  • Where a service pipe of 50 mm or more (service pipework 30 mm or more) feeds two or more floors, fit a conspicuous, accessible valve.
  • Provide a permanent line diagram showing pipework of 25 mm or more, meters, controls, valves and test points.

The diagram is displayed near the primary meter or emergency control.

Why the others are wrong:

A: gauges alone are not required.

C: extra meters are not the requirement.

D: regulation 24 applies to these buildings.

Memory trick:

Big supply, valve and drawing.

Find it in the book

HSE L56 (5th edition, 2018), page 51

Reg HSE L56 (5th edition, 2018), regulation 24(1)

Q4. You need to use a blowtorch to remove a fitting from a gas pipe. What should be done first?

Show answer

Answer: C. Isolate the supply and purge the gasway of gas

  • Do not use any source of ignition, such as blowlamps, where it could cause fire or explosion on gasways.
  • Use a safe system of work with effective isolation, and purge gasways before using a blow torch.

Heat guns count as sources of ignition too.

Why the others are wrong:

A: ventilation alone does not make it safe.

B: a low flame is still an ignition source.

D: this does not remove the gas.

Memory trick:

Purge before the flame.

Find it in the book

HSE L56 (5th edition, 2018), page 28

Reg HSE L56 (5th edition, 2018), regulation 6(4) and guidance para 120

Q5. When should new gas pipework joints be painted or wrapped?

Show answer

Answer: A. After the tightness test

  • Test joints before they are painted or protected.
  • Paint applied before testing can give a temporary seal and falsify the result.

All affected joints should be visually inspected as part of the test.

Why the others are wrong:

B: joints are tested first wherever they are.

C: protective coating is applied after testing.

D: paint could seal a leak and falsify the test.

Memory trick:

Test then paint.

Find it in the book

HSE L56 (5th edition, 2018), page 49

Reg HSE L56 (5th edition, 2018), regulation 22(1) and guidance para 216

Q6. You are extending pipework on a steam system. What must the design take into account?

Show answer

Answer: C. Whether the protective devices are still adequate

  • Modifications (including extensions) must consider the original design, the new duty, effects on integrity, whether protective devices are still adequate and the written scheme.
  • The work must be done by a competent person.

The repairer's employer has the duty.

Why the others are wrong:

A: colour is not the safety issue.

B: modifications include extensions and additions.

D: cost is not a PSSR factor.

Memory trick:

Extend the pipe, re-check the protection.

Find it in the book

HSE L122 (2nd edition, 2014), page 46

Reg HSE L122 (2nd edition, 2014), regulation 13 and ACOP para 174

Want 194 more CITB Heating and Plumbing Services questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Heating and Plumbing Services topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE, GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic