MCS Heat Pump Installer and Boiler Upgrade Scheme Practice

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

Under the Warm Homes Plan, Boiler Upgrade Scheme grants for heat pumps can only be claimed through an MCS certified installer. These timed mocks test what you need to know to get grants paid and pass MCS assessments: 40 questions in 60 minutes, aim for 80%.

The questions cover BUS eligibility and grants, applications, evidence and installer duties, the MCS operating requirements, Customer Commitment and quotations, heat loss and system design, installation, commissioning and handover, and MCS 020(a) sound assessments. Every question is original, written from Ofgem's BUS Guidance for Installers and the free MCS standards, with the page to look up. You get 160 questions across 4 mocks, and the first mock is free.

Mock exams

MCS-HP-BUS

MCS Heat Pump Installer and Boiler Upgrade Scheme

40 questions · 1 hour · aim for 80%

Closed book. Practice for the knowledge MCS heat pump installers need.

Find it in the book: Every answer shows the page where you can find it in Ofgem BUS Guidance for Installers V5.2 (Oct 2026), MCS MIS 3005-D:2025 V2.0 and MCS 020 a) Issue 1.1.

Practise in the real exam format

Take timed papers, flag questions to revisit, and review every answer after submitting. Mock 1 is free.

About the MCS Heat Pumps and BUS exam

  • For heat pump installers, MCS contractors and heating engineers moving into heat pumps
  • Mocks are 40 questions in 60 minutes; aim for 80%
  • Topics: BUS eligibility and grants; BUS applications and evidence; MCS operating requirements and contracts; heat loss and design; installation, commissioning and handover; MCS 020(a) sound
  • Written from Ofgem's Boiler Upgrade Scheme Guidance for Installers 2 (Oct 2026), MIS 3005-D:2025, MIS 3005-I:2025, MCS 020(a) and the MCS Installer Operating Requirements
  • There is no single national exam: these mocks are knowledge practice
  • Every answer explained, with the page it comes from

How the online MCS Heat Pumps and BUS mock exam works

Each mock is a timed online practice exam: answer every question against the clock, flag the ones you're unsure of, then get your score and a worked answer for every question.

Questions per mock40
Time limit1 hour
Our target score80%
BooksClosed book. Practice for the knowledge MCS heat pump installers need.
Mock exams4 (1 free)

MCS Heat Pumps and BUS: frequently asked questions

Who can claim a Boiler Upgrade Scheme grant?

The application is made by an MCS certified installer on the property owner's behalf, under Ofgem's BUS rules. Our mocks cover the eligibility and evidence rules in Ofgem's guidance for installers.

Do the mocks cover the new MCS scheme?

Yes. Questions name the document they come from, such as MIS 3005-D:2025 or the redeveloped scheme's Installer Operating Requirements 0, because the current and redeveloped MCS schemes run side by side for now.

Are these the real test questions?

No. Every question is original, written by FreeMocks from free official guidance. We never copy licensed question banks, so the wording will differ, but the facts tested are the same.

Practice questions by topic

Free official guides to download

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (Ofgem, GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revision guides for this exam

Related mock exams