MCS Heat Pumps and BUS: Boiler Upgrade Scheme: applications, evidence and installer duties practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

28 of our 160 MCS Heat Pump Installer and Boiler Upgrade Scheme (MCS-HP-BUS) questions are on boiler upgrade scheme: applications, evidence and installer duties, about 18% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Under the BUS guidance V5.2, where must the BUS grant be shown as a deduction for the property owner?

Show answer

Answer: B. On the quote before installation and on the final invoice

  • Deduct the full BUS grant from the quote before any payment by the owner.
  • The discount must appear on the quote (pre-installation) and on the invoice afterwards.

Failure to deduct upfront can lead to rejection or revocation.

Why the others are wrong:

A: the deduction must appear on the quote and invoice the customer sees.

C: the grant is an upfront discount, not a later refund.

D: the discount must appear at quote stage as well as on the invoice.

Memory trick:

Show the grant twice: quote and invoice.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), page 60

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), para 5.34

Q2. A builder runs a newly fitted heat pump for two weeks to dry plaster before the emitters are finished. Under the BUS guidance V5.2, when is the system commissioned?

Show answer

Answer: B. When the whole system is installed, tested and signed off

  • Commissioning means the system is fully installed, tested and signed off to MCS standards and manufacturer requirements.
  • It includes all components in the design, for example every heat emitter.

Limited early use such as drying plaster does not count.

Why the others are wrong:

A: running it to dry plaster is allowed but does not count as commissioning.

C: powering up one part is not commissioning, every component in the design must be done.

D: the voucher date is unrelated, commissioning depends on the system being complete and signed off.

Memory trick:

Drying plaster is not commissioning.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), page 20

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), para 3.11

Q3. A homeowner thinks Ofgem was wrong to reject the voucher application. Under the BUS guidance V5.2, who can request a review, and by when?

Show answer

Answer: D. Only the installer, within 28 days of the decision notice

  • If an owner or installer thinks there is an error, only the installer can request a review.
  • The request must be received within 28 days of the date of the decision notice.

Often it is quicker to fix the problem and re-apply.

Why the others are wrong:

A: the property owner cannot request a review themselves.

B: only the installer may ask for a review and the limit is 28 days.

C: the request must arrive within 28 days, not 3 months.

Memory trick:

Installer asks, inside 28.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), pages 96 to 97

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), paras 10.07 and 10.13

Q4. Ofgem wants to carry out a site audit. Under the BUS guidance V5.2, how much notice must the formal access request give?

Show answer

Answer: A. At least two days

  • A formal access request is issued as a notice at least two days before the inspection.
  • It sets out the purpose, the owner's right to refuse and the consequences of refusing.

All Ofgem site auditors are DBS checked.

Why the others are wrong:

B: a formal notice must be issued at least two days before.

C: 14 days is used for information requests, not the audit access notice.

D: 28 days is not the access notice period.

Memory trick:

Two days' warning for a visit.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), page 83

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), para 8.07

Q5. Ofgem has emailed the property owner asking them to confirm consent to your voucher application. Under the BUS guidance V5.2, how long do they have to respond using the email link?

Show answer

Answer: C. 14 days

  • Owners must give consent via the validation link within 14 days of Ofgem's email.
  • If not, the application will expire and may be rejected.

Tell the owner to expect the email so it is not missed.

Why the others are wrong:

A: 7 days is the time MCS asks owners to respond to its own checks.

B: 28 days applies to the assisted digital route by phone and post.

D: 21 days is not a consent deadline in the guidance.

Memory trick:

Two weeks to click.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), page 61

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), para 5.42

Q6. Under the BUS guidance V5.2, after a voucher redemption is approved, how are BUS grant payments normally made?

Show answer

Answer: A. Weekly, usually within five working days of approval

  • Ofgem runs a weekly payment schedule, so payments are usually made within five working days of approval.
  • Banks may take three to five working days more to clear funds; contact Ofgem if nothing arrives after ten working days.

Payments go by BACS to a UK sterling account.

Why the others are wrong:

B: quarterly reports are separate from payments.

C: payment goes to the installer by BACS, not to the owner.

D: Ofgem runs a weekly payment schedule.

Memory trick:

Weekly pay run, five working days.

Find it in the book

Ofgem BUS Guidance for Installers V5.2 (Oct 2026), page 75

Reg Ofgem BUS Guidance for Installers V5.2 (Oct 2026), para 6.04

Want 154 more MCS Heat Pumps and BUS questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other MCS Heat Pumps and BUS topics

Free official guides for this topic