What is the City & Guilds 2391-52 qualification?
Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).
The City & Guilds 2391-52 is the combined initial verification and periodic inspection and testing qualification. It is aimed at electricians who need to inspect, test and certify electrical installations, and it is widely asked for by employers and scheme providers. This guide explains what the qualification covers, how the assessment works and how to prepare.
Looking for practice papers? Our 2391-52 mock exam papers are timed like the real written exam, and the first one is free.
What the 2391-52 covers
The 2391-52 combines initial verification of new installations and periodic inspection and testing of existing ones in one qualification. City & Guilds also offers them separately as the 2391-50 (Initial Verification) and the 2391-51 (Periodic Inspection and Testing).
- Safe isolation of circuits and installations before any work or testing.
- The inspection sequence: what to look at before any instrument comes out.
- The correct order of dead tests and live tests, and why the order matters.
- Completing certification: the Electrical Installation Certificate (EIC) for new work and the Electrical Installation Condition Report (EICR) for existing installations.
- Reading results against the limits in BS 7671 and IET Guidance Note 3 (GN3).
How the assessment works
The 2391-52 has a multiple-choice test of 60 questions in 2 hours, which is open book. The practical assessment has three tasks: a photo-based inspection exercise (30 minutes), testing on a test rig, and a short written paper. You need to pass both parts. Always check the current City & Guilds handbook, as details can change.
The tests you need to know
The knowledge test expects you to know each test, its purpose and its place in the sequence:
- Continuity of protective conductors, including main and supplementary bonding.
- Continuity of ring final circuit conductors (the end-to-end readings and what they tell you).
- Insulation resistance: test voltages from Table 64 and the minimum acceptable values.
- Site-applied insulation and protection by separation.
- Polarity, checked dead before the supply is connected.
- Earth fault loop impedance, both measured and calculated from Ze and R1 + R2.
- Prospective fault current at the origin and at relevant points in the installation.
- RCD operation: test currents, trip times and the additional protection requirements.
- Verification of phase sequence and functional testing of switches, isolators and assemblies.
For each one, know the instrument setting, the expected result and what a fail looks like. Questions often describe a reading and ask what you would do next.
Books you can use
The multiple-choice test is open book. Check with your centre which books are allowed; candidates usually use BS 7671, the On-Site Guide and IET Guidance Note 3.
Practical revision tips
- Learn the test sequence as a single ordered list. Many questions are really asking which test comes next.
- Practise reading GN3, not just BS 7671. The expected test methods and example forms live there.
- Know the difference between an EIC and an EICR, when each is used, and what the observation codes (C1, C2, C3, FI) mean on a condition report.
- Work through timed mock questions so the wording of the real exam feels familiar.
- For the practical, rehearse safe isolation until it is automatic: prove dead, lock off, prove the tester.
Test yourself before the exam
The fastest way to find your weak spots is a timed mock under exam conditions. FreeMocks has practice questions for inspection and testing topics, each with a full workout explaining the answer.
Always check the current City & Guilds 2391-52 qualification handbook for the authoritative assessment details, and refer to BS 7671 and GN3 for the requirements themselves.
