MCS Heat Pumps and BUS: Sound assessment and permitted development (MCS 020(a)) practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

24 of our 160 MCS Heat Pump Installer and Boiler Upgrade Scheme (MCS-HP-BUS) questions are on sound assessment and permitted development (mcs 020(a)), about 15% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. A datasheet only shows 'noise level: 48 dB(A)' without saying what it is. What should you do?

Show answer

Answer: D. Ask the manufacturer before starting the assessment

  • If it is not clear whether a figure is sound power, clarity should be sought from the manufacturer before starting.
  • Sound power and sound pressure are different quantities.

Data may also be on the product fiche, energy label or MCS product database.

Why the others are wrong:

A: low noise mode values shall not be used.

B: there is no fixed conversion in the standard.

C: you cannot assume it is sound power; clarity should be sought.

Memory trick:

Unclear label? Ask before you calculate.

Find it in the book

MCS 020 a) Issue 1.1, page 12

Reg MCS 020 a) Issue 1.1, Step 3

Q2. A slatted timber fence stands between the heat pump and the neighbour's window. What barrier attenuation applies?

Show answer

Answer: B. 0 dB, as gappy fences are not a barrier

  • Open fences, fences with gaps or cracks, and vegetation do not count as barriers.
  • Walls or fences in poor repair do not count either.

In the worked example the slatted fence gave 0 dB.

Why the others are wrong:

A: a fence with gaps gives no attenuation at all.

C: Type 1 needs solid masonry or a solid fence 18 mm or more.

D: Type 2 must be solid with no gaps.

Memory trick:

Gaps let sound through.

Find it in the book

MCS 020 a) Issue 1.1, page 14

Reg MCS 020 a) Issue 1.1, Step 6

Q3. A heat pump has Lw 57 dB(A), Q4, 4.0 m from the assessment position, behind a solid 12 mm fence with partial view. What is the result?

Show answer

Answer: D. 37.5 dB(A), which fails

  • A solid fence under 18 mm is Type 2; with partial view it gives 2.5 dB.
  • Lp = 57 + 10 log(4 / (4 x pi x 4²)) - 2.5 = 37.5 dB(A), above 37.0 dB(A).

Moving the unit or improving the barrier could bring it within the limit.

Why the others are wrong:

A: the result rounds to 37.5 dB(A), which is above 37.0.

B: this ignores the barrier; 2.5 dB should be subtracted.

C: this wrongly takes 5 dB off; a Type 2 barrier with partial view gives 2.5 dB.

The maths

4 x pi x 4² = 201.1; 4 / 201.1 = 0.0199
10 log(0.0199) = -17.0
57 - 17.0 - 2.5 = 37.5 dB(A), which is above 37.0, so it fails.

Memory trick:

Thin fence, half credit.

Find it in the book

MCS 020 a) Issue 1.1, pages 14 to 15

Reg MCS 020 a) Issue 1.1, Steps 6 to 8

Q4. An installation claimed as permitted development does not meet MCS 020 a). What may follow?

Show answer

Answer: A. LPA enforcement action and possible MCS sanctions

  • Contractors are under a duty to make sure installations under permitted development meet MCS 020 a).
  • MCS may impose penalties or sanctions, and the local planning authority may take enforcement action.

Check before you install, not after.

Why the others are wrong:

B: the DNO has no role here.

C: non-compliance does not lead to automatic permission.

D: the LPA may take enforcement action and MCS may impose sanctions.

Memory trick:

Fail the sums, face the LPA.

Find it in the book

MCS 020 a) Issue 1.1, page 7

Reg MCS 020 a) Issue 1.1, clause 1.4

Q5. Looking from the top edge of the heat pump, the neighbour's window is hidden behind a wall, but you can see it if you move 0.2 m upwards. What line of sight is this?

Show answer

Answer: B. Partial view

  • Full view: visible from the top edge of the unit.
  • Partial view: visible by moving up to 0.25 m in any direction from the top edge.

No view: the barrier completely hides the position.

Why the others are wrong:

A: no view means the barrier fully hides the position; here a 0.2 m move reveals it.

C: the wall still exists as a barrier; the question is about line of sight.

D: full view means visible from the top edge without moving.

Memory trick:

A quarter metre peek is partial.

Find it in the book

MCS 020 a) Issue 1.1, page 14

Reg MCS 020 a) Issue 1.1, Step 6

Q6. Under MCS 020 a), what must the written description of each assessment position include?

Show answer

Answer: B. The address, exact window or door location and floor level

  • The description shall be detailed enough to identify the position, including the property address, the exact location of the window or door and the floor level.
  • Attaching a map, sketch or photo to the workings is recommended.

This helps compliance checks and any future queries.

Why the others are wrong:

A: the description needs the property address, exact window or door location and floor level.

C: the distance is measured in Step 5; the description is about identifying the position.

D: glazing details are not part of the required description.

Memory trick:

Address, opening, floor.

Find it in the book

MCS 020 a) Issue 1.1, pages 11 to 12

Reg MCS 020 a) Issue 1.1, Step 2

Want 154 more MCS Heat Pumps and BUS questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other MCS Heat Pumps and BUS topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (Ofgem, GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic