Q1. A crane will lift a rooftop unit near an overhead line. Why is staying just clear of the line not enough?

Show answer

Answer: B. Electricity can flash over without contact

  • Electricity can flash over from overhead lines even when plant does not touch them.
  • Ask the owner to switch them off or advise a safe working distance.

Over half of fatal electrical accidents involve overhead lines.

Why the others are wrong:

A: line type does not remove the flash-over risk.

C: sag is not the reason given.

D: they are dangerous in all weather.

Memory trick:

No touch needed to get hurt.

Find it in the book

HSE INDG231 (rev1, 2012), page 5

Reg HSE INDG231 (rev1, 2012), overhead power lines

Q2. On a flat roof with no edge protection, you wear a harness on a short lanyard that stops you reaching the edge. How is this classed?

Show answer

Answer: B. Personal protection that prevents a fall

  • A work restraint (travel restriction) system prevents a worker getting into a fall position.
  • It needs the worker to put it on and connect it, so it is personal protection, not collective.

Fall-arrest kit, by contrast, only minimises the fall once it happens.

Why the others are wrong:

A: it relies on the worker wearing it, so it is not collective protection.

C: restraint stops the fall happening; fall arrest is what minimises a fall.

D: guard rails and nets are collective; a harness is personal and this one prevents the fall.

Memory trick:

Restraint stops you reaching the edge.

Find it in the book

HSE INDG401 (rev2, 2014), page 4

Reg HSE INDG401 (rev2, 2014), Figure 1 step-by-step diagram

Q3. Overnight storms hit the site. The access scaffold was inspected two days ago. What now?

Show answer

Answer: D. It must be inspected again before use

  • Inspect after any event liable to affect stability, such as adverse weather or accidental damage.
  • This is as well as the regular 7-day inspections.

Do not use it until a competent person has checked it.

Why the others are wrong:

A: a quick look from below is not an inspection.

B: an event affecting stability needs a new inspection.

C: it must not be used before being re-inspected.

Memory trick:

Storm passes, check again.

Find it in the book

HSE INDG401 (rev2, 2014), page 5

Reg HSE INDG401 (rev2, 2014), how do you make sure the equipment is in good condition

Q4. When must a supported trench for a new gas main be inspected by a competent person?

Show answer

Answer: A. At the start of each shift before work begins

  • A supported excavation must be inspected by a competent person at the start of the shift in which work is to be done.
  • Also after any event likely to affect its strength or stability and after any material falls or is dislodged.

Work must not continue until any problem found has been put right.

Why the others are wrong:

B: inspection is a legal duty, not on request.

C: events trigger extra inspections, but every shift is also needed.

D: inspection is needed every shift.

Memory trick:

New shift, new check.

Find it in the book

HSE L153 (2015), page 52

Reg HSE L153 (2015), regulation 22(4) and (5)

Q5. What is the first step when planning work at height?

Show answer

Answer: A. Avoid work at height if you reasonably can

  • Avoid work at height where reasonably practicable.
  • Then prevent falls, then minimise the distance and consequences.

Do as much work as possible from the ground.

Why the others are wrong:

B: nets minimise a fall; they are a later step.

C: harnesses come after avoiding and preventing falls.

D: first aid does not prevent a fall.

Memory trick:

Avoid, prevent, minimise.

Find it in the book

HSE INDG401 (rev2, 2014), page 1

Reg HSE INDG401 (rev2, 2014), introduction

Q6. You need to dig near a building to expose a gas service. What should you assume about buried cables?

Show answer

Answer: D. That cables are present until proved otherwise

  • Always assume cables will be present when digging in the street, pavement or near buildings.
  • Use up-to-date plans, cable avoidance tools and safe digging.

HSG47 gives more detailed guidance.

Why the others are wrong:

A: missing plans do not mean no cables.

B: other services are likely to be nearby.

C: cable depth cannot be assumed.

Memory trick:

Assume live until proven.

Find it in the book

HSE INDG231 (rev1, 2012), page 4

Reg HSE INDG231 (rev1, 2012), underground power cables

Want 194 more CITB Heating and Plumbing Services questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Heating and Plumbing Services topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE, GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic