Q1. You are adding an EV charger to a house whose maximum demand is close to the supply fuse rating. The charger has automatic load curtailment. What does BS 7671 allow in the maximum demand assessment?
Show answer
Answer: B. Load curtailment, automatic or manual, may be taken into account
- 722.311.201: load curtailment, including load reduction or disconnection, either automatically or manually, may be taken into account when determining maximum demand.
132.16 still requires the existing equipment, including the supply, to be adequate.
Why the others are wrong:
A: the regulation covers curtailment either automatically or manually.
C: with load curtailment, the reduced demand may be used in the assessment.
D: 722.311.201 allows load curtailment to be taken into account.
Memory trick:
Smart chargers can shrink the demand sum.
Find it in the book
BS 7671:2018+A4:2026, page 350