AM2S v1 Knowledge Test: Design and planning practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 180 AM2S v1 Knowledge Test (Section E) (AM2S-V1) questions are on design and planning, about 9% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. You are adding an EV charger to a house whose maximum demand is close to the supply fuse rating. The charger has automatic load curtailment. What does BS 7671 allow in the maximum demand assessment?

Show answer

Answer: B. Load curtailment, automatic or manual, may be taken into account

  • 722.311.201: load curtailment, including load reduction or disconnection, either automatically or manually, may be taken into account when determining maximum demand.

132.16 still requires the existing equipment, including the supply, to be adequate.

Why the others are wrong:

A: the regulation covers curtailment either automatically or manually.

C: with load curtailment, the reduced demand may be used in the assessment.

D: 722.311.201 allows load curtailment to be taken into account.

Memory trick:

Smart chargers can shrink the demand sum.

Find it in the book

BS 7671:2018+A4:2026, page 350

Reg BS 7671:2018+A4:2026, 722.311.201

Q2. A balanced 400 V three-phase sub-main is 50 m long, with Ib = 25 A and a tabulated 6.4 mV/A/m for the cable. What is the voltage drop and is it within 5 %?

Show answer

Answer: C. 8.0 V, within the 20 V limit

  • Appendix 4 section 6: for three-phase circuits the tabulated mV/A/m values relate to the line voltage, assuming balanced loads.
  • VD = 6.4 × 25 × 50 ÷ 1000 = 8.0 V; 5 % of 400 V = 20 V.

Use the mV/A/m column for the right number of cores and phases.

Why the others are wrong:

A: this divides by √3, which isn't needed when using three-phase mV/A/m values.

B: this doubles the result; the three-phase mV/A/m value already allows for the whole circuit.

D: this wrongly multiplies by √3; the three-phase mV/A/m value already relates to line voltage.

The maths

VD = 6.4 × 25 × 50 ÷ 1000 = 8.0 V
Limit = 5 % × 400 V = 20 V

Memory trick:

Three-phase mV/A/m: compare with 400 V.

Find it in the book

BS 7671:2018+A4:2026, page 457

Reg BS 7671:2018+A4:2026, Appendix 4, 6 and Table 4Ab

Q3. An old circuit is protected by a 30 A BS 3036 semi-enclosed fuse giving overload protection. What minimum It does the cable need, ignoring other factors?

Show answer

Answer: D. About 41.4 A

  • Appendix 4 section 4: for a BS 3036 fuse giving overload protection, use a factor of 1.45 ÷ 2 = 0.725 as a divisor of the fuse rating.
  • It ≥ 30 ÷ 0.725 = 41.4 A.

The fuse needs about twice its rating to blow in the conventional time, so the cable must be bigger.

Why the others are wrong:

A: a BS 3036 fuse needs the 0.725 factor applied.

B: this multiplies by 0.725 instead of dividing.

C: this divides by 0.69; the factor is 1.45 ÷ 2 = 0.725.

The maths

It ≥ 30 ÷ 0.725 = 41.4 A

Memory trick:

Rewirable fuse? Divide by 0.725.

Find it in the book

BS 7671:2018+A4:2026, page 452

Reg BS 7671:2018+A4:2026, Appendix 4, 4

Q4. A cable protected by a 32 A device passes through 100 mm of loft insulation, totally surrounded for that length only. What It does the derating factor require?

Show answer

Answer: C. About 41.0 A, using a factor of 0.78

  • Appendix 4 section 2.6, cable totally surrounded for less than 0.5 m: 50 mm 0.88, 100 mm 0.78, 200 mm 0.63, 400 mm 0.51, 500 mm or more 0.5.
  • It ≥ 32 ÷ 0.78 = 41.0 A.

These factors apply to cables up to 10 mm².

Why the others are wrong:

A: 0.63 is for 200 mm in insulation.

B: 0.88 is for 50 mm in insulation.

D: 0.5 applies only where the cable is surrounded for 0.5 m or more.

The maths

It ≥ 32 ÷ 0.78 = 41.0 A

Memory trick:

100 mm of wool: 0.78.

Find it in the book

BS 7671:2018+A4:2026, page 451

Reg BS 7671:2018+A4:2026, Appendix 4, 2.6

Q5. A 40 m lighting circuit on a public supply has a design current of 6 A. Using the 3 % limit (6.9 V), what is the maximum mV/A/m you can accept, and will 1.5 mm² twin and earth (29 mV/A/m) do?

Show answer

Answer: C. About 28.8 mV/A/m, so 1.5 mm² just fails

  • Appendix 4, section 5: the permissible voltage drop in mV, divided by Ib and by the length, gives the maximum mV/A/m.
  • 6900 ÷ (6 × 40) = 28.75 mV/A/m.
  • 1.5 mm² at 29 mV/A/m is over this; 2.5 mm² (18 mV/A/m) would comply.

Doing the voltage drop check first can decide the cable size straight away.

Why the others are wrong:

A: this uses the 5 % limit (11.5 V), which is for other uses, not lighting.

B: the volts must be converted to millivolts before dividing.

D: 29 mV/A/m is above 28.8, so 1.5 mm² would just exceed the limit.

The maths

Max mV/A/m = 6900 mV ÷ (6 A × 40 m)
= 28.75 mV/A/m; 29 > 28.75, so 1.5 mm² fails

Memory trick:

Allowed millivolts ÷ amps ÷ metres.

Find it in the book

BS 7671:2018+A4:2026, page 452

Reg BS 7671:2018+A4:2026, Appendix 4, 5 and Table 4Ab

Q6. An installation is supplied from its own private LV transformer, not the public network. What overall voltage drop limits does Table 4Ab give for lighting and for other uses?

Show answer

Answer: A. 6 % for lighting and 8 % for other uses

  • Table 4Ab: public LV supply: lighting 3 %, other uses 5 %.
  • Private LV supply: lighting 6 %, other uses 8 %, but the drop within each final circuit should not exceed the public-supply values.

A private LV supply usually means the installation has its own transformer.

Why the others are wrong:

B: the figures are the wrong way round; lighting has the lower limit.

C: Table 4Ab separates lighting and other uses for both supply types.

D: these are the limits for installations supplied directly from the public LV system.

Memory trick:

Private supply: 6 and 8.

Find it in the book

BS 7671:2018+A4:2026, page 458

Reg BS 7671:2018+A4:2026, Appendix 4, 6.4, Table 4Ab

Want 174 more AM2S v1 Knowledge Test questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other AM2S v1 Knowledge Test topics