AM2S v1 Knowledge Test: Building Regulations practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

20 of our 180 AM2S v1 Knowledge Test (Section E) (AM2S-V1) questions are on building regulations, about 11% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. You are fitting an intermittent extract fan in an internal WC with no openable window. What control does Approved Document F ask for?

Show answer

Answer: C. A run-on of at least 15 minutes after the room is vacated

  • ADF 1.51: in a room with no openable window, an intermittent extract fan should have controls that keep it running for at least 15 minutes after the room is vacated.
  • 1.50: automatic controls, such as humidity control, should have a manual override.

Commissioning checks include confirming run-on timers are set to at least 15 minutes.

Why the others are wrong:

A: ADF asks for at least 15 minutes.

B: 1.50 says automatic controls should have a manual override.

D: with no window, the fan should run on for at least 15 minutes after the room is vacated.

Memory trick:

No window: 15 minutes of run-on.

Find it in the book

Approved Document F Volume 1 (2026 edition), page 14

Reg Approved Document F Volume 1, paragraph 1.51

Q2. You are fitting new downlights in an open-plan kitchen-diner. What does Approved Document L ask for in the way of lighting controls?

Show answer

Answer: D. Local controls for each space or zone

  • ADL (2026) 5.58: internal luminaires should have local controls allowing separate control of lighting in each space or zone.
  • Controls may be manual, automatic or a combination of both.
  • 5.56: fixed lighting should suit the activity and spaces should not be over-illuminated.

Zoning lets the occupier light only the area in use.

Why the others are wrong:

A: ADL wants separate control of each space or zone.

B: controls may be manual, automatic or a combination.

C: ADL has both efficacy and local control guidance.

Memory trick:

Each zone its own switch.

Find it in the book

Approved Document L Volume 1 (2026 edition), page 55

Reg Approved Document L Volume 1, paragraph 5.58

Q3. You are hard-wiring a carbon monoxide alarm on the ceiling of the room with a new gas boiler. Where should it go?

Show answer

Answer: A. On the ceiling 300 mm from walls, 1 m to 3 m from the boiler

  • ADJ 3.45: in the same room as the appliance:
  • (a) on the ceiling at least 300 mm from any wall, or on a wall as high as possible (above doors and windows) but not within 150 mm of the ceiling; and
  • (b) between 1 m and 3 m horizontally from the appliance.

A CO alarm is no substitute for correct installation and servicing.

Why the others are wrong:

B: on a wall it should be as high as possible, above doors and windows, but not within 150 mm of the ceiling.

C: ADJ asks for 1 m to 3 m horizontally from the appliance.

D: the horizontal distance should be between 1 m and 3 m.

Memory trick:

CO alarm: 1 to 3 m away, 300 mm off the wall.

Find it in the book

Approved Document J (2010 edition incorporating 2010, 2013 and 2022 amendments), page 55

Reg Approved Document J, paragraph 3.45

Q4. In a wet room with no shower tray, the shower head is on the wall 2.0 m up. You add a light to an existing circuit 1.0 m horizontally from the centre of the shower head, at 2.1 m high. Is this notifiable?

Show answer

Answer: C. Yes, it is within 1.2 m of the shower head and below 2.25 m

  • Regulation 12(6A): additions or alterations to existing circuits in a special location are notifiable.
  • Special location: vertically from the floor to 2.25 m (or the shower head if higher); horizontally 0.6 m from a bath or tray, or 1.2 m from the centre of the shower head where there is no tray.
  • 1.0 m and 2.1 m are both inside, so it is notifiable.

This is the Building Regulations space, which is not the same as the BS 7671 zones.

Why the others are wrong:

A: additions to existing circuits in a special location are notifiable.

B: 0.6 m applies where there is a bath tub or shower tray; with no tray it is 1.2 m from the shower head centre.

D: the space extends to 2.25 m, or higher only if the shower head is above 2.25 m.

Memory trick:

No tray? 1.2 m from the head.

Find it in the book

Approved Document P (2013 edition), page 6

Reg Approved Document P, paragraph 2.5 (regulation 12(9))

Q5. You are fitting an EV charge point to meet Approved Document S at a new house. What minimum output and charging mode should it have?

Show answer

Answer: D. At least 7 kW, Mode 3, on a dedicated circuit

  • ADS 6.2: each charge point should be designed to BS EN 61851, have a minimum nominal rated output of 7 kW, and be a minimum Mode 3 system on a dedicated circuit, or equivalent.
  • It must also meet BS 7671 and the IET Code of Practice.

ADS does not itself give electrical safety guidance; that comes from BS 7671 and Part P.

Why the others are wrong:

A: a ring socket isn't a Mode 3 dedicated circuit.

B: ADS asks for at least 7 kW and Mode 3 on a dedicated circuit.

C: 22 kW isn't required; the minimum is 7 kW.

Memory trick:

ADS charger: 7 kW, Mode 3, own circuit.

Find it in the book

Approved Document S (2021 edition), page 27

Reg Approved Document S, paragraph 6.2(b) and (e)

Q6. For parking spaces that need cable routes for future charge points, what should be provided at the metered supply point?

Show answer

Answer: D. Space for a new connection and a dedicated safe cable route

  • ADS 6.7: cable routes run from a metered electricity supply point to the future connection location.
  • Provide sufficient space for a new electrical connection at the metered supply point (such as a consumer unit or feeder pillar) and a dedicated safe and unobstructed route to the future connection location.

This makes installing a charger later quick and cheap.

Why the others are wrong:

A: 6.7 asks for space at the metered supply point as well as the route.

B: ADS asks for space for a new connection, not a fitted device.

C: cable routes are for future charge points; a charger isn't needed now.

Memory trick:

Room at the board, a clear route to the bay.

Find it in the book

Approved Document S (2021 edition), page 29

Reg Approved Document S, paragraph 6.7

Want 174 more AM2S v1 Knowledge Test questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other AM2S v1 Knowledge Test topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic