Electrical safe isolation procedure: the steps, tests and kit
Updated 30 October 2026. Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).
Safe isolation means switching off and locking off the supply to the circuit you will work on, then proving it dead at the point of work with a voltage indicator that you check on a known live source or proving unit before and after the test. It is how electricians meet Regulations 12 and 13 of the Electricity at Work Regulations 1989, and it is a section of its own in the AM2 practical assessment.
Why safe isolation is a legal duty
The Electricity at Work Regulations 1989 apply to all work on electrical systems. Regulation 12 requires suitable means, where needed to prevent danger, for cutting off the supply and isolating equipment from every source of electrical energy in a secure way. Regulation 13 requires adequate precautions so that equipment made dead cannot become live again while you work on it. Regulation 14 bans live working unless it is unreasonable for the equipment to be dead, it is reasonable to work on it live, and suitable precautions are taken. Regulation 16 says you must be competent, or properly supervised, for the work you take on.
HSE makes the same point in its case study of an electrician who was shocked during a fit-out: plan the work, make the supply dead, prove it dead and stop it being switched back on.
Kit you need
You need a two-pole voltage detector or a proprietary test lamp that meets HSE Guidance Note GS38 (4th edition, 2015). GS38 asks for finger barriers on the probes, no more than 4 mm of exposed metal tip and strongly recommends 2 mm or less, and fused or current-limited leads where the instrument needs them. You also need a proving unit, or another known live source, to check the indicator works. Then add locking-off devices for the breakers, fuse carriers or isolators you will use, a padlock with a key that you keep, and caution notices.
Non-contact voltage detectors are not suitable for proving dead. GS38 says they should only be used to identify live equipment, so a no-light result does not prove a cable is dead. GS38 also advises using a test lamp or two-pole detector rather than a multimeter to check for voltage, because a wrongly set multimeter has caused accidents.
The safe isolation procedure, step by step
This is the sequence taught in most UK training, based on the Electrical Safety Council best practice guide on safe isolation. Some guidance, such as a 2009 IET Wiring Matters article, puts locking off after the dead test. Both meet the legal duty. Follow the order your assessment centre uses.
- 1. Get permission to isolate from the person responsible for the installation, and warn anyone affected
- 2. Identify the correct circuit and point of isolation using drawings, the circuit chart and labelling. Do not trust the chart on its own
- 3. Check your voltage indicator against GS38 and confirm it is working on a proving unit or known live source
- 4. Switch off and isolate at the identified device
- 5. Secure the isolation with a lock. Keep the key on you
- 6. Fix a caution notice at the point of isolation
- 7. At the point of work, test between all live conductors and between each live conductor and earth to prove the circuit is dead
- 8. Prove the voltage indicator again on the same proving unit or known live source, to show it did not fail during the test
- 9. Only now start work. If you leave the job, the lock stays on until you return
Which conductors to test
Test every combination of conductors at the point of work. That includes the neutral, because a neutral can carry current from another circuit or be live because of a fault. A single-phase circuit needs three tests. A three-phase and neutral circuit needs ten.
| Supply | Tests | Combinations |
|---|---|---|
| Single-phase | 3 | L-N, L-E, N-E |
| Three-phase, no neutral | 6 | L1-L2, L2-L3, L3-L1, L1-E, L2-E, L3-E |
| Three-phase and neutral | 10 | L1-L2, L2-L3, L3-L1, L1-N, L2-N, L3-N, L1-E, L2-E, L3-E, N-E |
Isolating a whole installation
For a whole installation, isolate at the main switch and lock it off, then prove dead at the point of work. Regulation 462.1.201 of BS 7671 requires a main switch that ordinary people will use, as in a house, to break both line and neutral of a single-phase supply. In a TT system the neutral must always be isolated, because the exemption in Regulation 461.2 for not isolating the neutral applies only to TN-S and TN-C-S systems. The service fuse belongs to the distributor. Only the distributor, or someone it has expressly authorised, may withdraw it.
Traps that catch people out
A second source of supply, or a shared conductor, can leave part of a circuit live after you think it is isolated. Check for each of the hazards below before you start.
- Borrowed neutrals, where a lighting or control circuit shares a neutral with another circuit. BS 7671 does not permit them, but you will still find them. Isolate both circuits
- Anything at the point of work fed from another circuit or supply, for example switching or control wiring from a different circuit. Regulation 12 of the EAWR means isolating from every source of electrical energy
- Solar PV inverters, battery storage and generators, which are sources of supply in their own right. Isolate them as the manufacturer describes. Amendment 4 adds a new Chapter 57 on stationary batteries
- Capacitors and batteries that can hold a charge after isolation
Amendment 4:2026 and devices for isolation
The procedure has not changed with Amendment 4, and the A4 summary of changes does not list Table 537.4. That table is still worth knowing for exams. It shows that a disconnector to BS EN 60947-3 is suitable for isolation but not for functional switching, while a switch-disconnector is suitable for both. So if a disconnector is your point of isolation, switch the load off first and only then open the disconnector.
Safe isolation in exams
Safe isolation is assessed twice in the AM2: section A1 (safe isolation and risk assessment) and section C (safe isolation of circuits). It also comes up in inspection and testing qualifications such as City & Guilds 2391 and 2392. Written questions tend to test the order of the steps, GS38 requirements, the number of test combinations and why a non-contact tester is not enough.
Official sources
Practise for it
Test yourself with a free timed mock, with every answer explained.
Start a free mockFrequently asked questions
What is the electrical safe isolation procedure?
Identify the circuit, switch off and isolate it, lock off and tag the isolator, prove your voltage indicator on a known live source or proving unit, test that the circuit is dead at the point of work, then prove the voltage indicator again.
What are the steps of safe isolation?
Get permission, identify the circuit, check the voltage indicator on a proving unit, isolate, lock off, fit a caution notice, test all conductors at the point of work, then prove the indicator again.
How many tests are needed to prove a three-phase circuit dead?
Ten for a three-phase and neutral circuit: three line to line, three line to neutral, three line to earth and one neutral to earth. A single-phase circuit needs three.
Can I use a multimeter or a voltage stick to prove dead?
No. GS38 says non-contact detectors are only for identifying live equipment, and it advises a test lamp or two-pole voltage detector rather than a multimeter. Prove the detector on a known live source before and after the test.
Which law requires safe isolation?
The Electricity at Work Regulations 1989, mainly Regulation 12 (means of cutting off the supply and isolation), Regulation 13 (precautions for work on equipment made dead) and Regulation 14 (work on or near live conductors).
Why do you prove the tester after testing?
To show the tester did not fail while you were using it. GS38 points out that any device used to prove dead can fail to indicate danger, so it must be checked before and after use.
Related
Sources: Electricity at Work Regulations 1989, Part II (legislation.gov.uk); HSE: Electricity at work, safe working practices (HSG85); HSE: Electrical test equipment for use on low voltage electrical systems (GS38); HSE case study: electrician shocked when supply was not properly isolated. This guide paraphrases the rules for revision; always work from the current official documents.
