Unvented discharge pipes: tundish, D1 and D2 rules explained

Updated 30 October 2026. Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

On an unvented hot water system, the relief valves discharge through a short metal pipe (D1) into a tundish fitted with no more than 600 mm of pipe from the valve outlet, then through a larger pipe (D2) to a safe, visible place. Approved Document G paragraphs 3.50 to 3.63 set out the rules. D2 needs at least 300 mm of vertical pipe below the tundish before any bend, a continuous fall of at least 1 in 200, and must be at least one size bigger than the valve outlet, more if the run is long.

Why the discharge pipe matters

An unvented system stores hot water under mains pressure. If the controls fail, the water can heat well above 100°C without boiling while it is under pressure, and if it is released suddenly it flashes to steam. Requirement G3(3) of the Building Regulations says precautions must stop the stored water exceeding 100°C and that any discharge from the safety devices must be carried safely to a place where it is visible.

Approved Document G paragraph 3.17 calls for at least two independent safety devices on top of any thermostat. Paragraph 3.18 gives one acceptable set-up: a non-self-resetting energy cut-out plus a temperature relief valve or a combined temperature and pressure relief valve. The discharge pipework is what makes those valves safe to operate.

D1: valve to tundish

D1 runs from the safety device to the tundish. Under paragraphs 3.50 to 3.53 it must be a short length of metal pipe at least the same size as the nominal outlet of the valve. Where valves discharge through a manifold, the manifold has to be sized for the combined discharge, and if other valves share it, it should be factory fitted as part of the unit or package.

The tundish

Paragraph 3.54 says the tundish should be vertical and in the same space as the unvented system. It should be as close as possible to the safety device and lower than it, with no more than 600 mm of pipe between the valve outlet and the tundish. Under paragraph 3.55, any discharge should be visible at the tundish so the occupier can see something is wrong.

Where a discharge might go unnoticed, for example because occupants have impaired vision or mobility, paragraph 3.55 suggests an electronically operated warning device.

D2: tundish to termination

D2 carries the discharge from the tundish to a safe place. Paragraphs 3.56 to 3.58 set the rules below. These are among the most common G3 exam questions.

  • A vertical section of at least 300 mm directly below the tundish before any bend or elbow (3.56)
  • A continuous fall of at least 1 in 200 for the rest of the run (3.56)
  • At least one pipe size larger than the nominal outlet of the safety device (3.58)
  • Larger again if the total resistance is more than 9 m of straight pipe: two sizes up for 9 to 18 m, three sizes up for 18 to 27 m (3.58)
  • Every elbow or bend adds equivalent length (see Table 3.1)
  • Made of metal, or another material shown to withstand the discharge temperature and clearly marked with its product and performance standard (3.57)

Sizing D2 with Table 3.1

Table 3.1 of Approved Document G gives the sizes for copper D2 (plastic pipe needs its own sizing data). Work out the total equivalent length by adding the straight pipe length to the allowance for each elbow or bend. Then pick the smallest pipe whose maximum resistance is not exceeded.

Valve outletMin D1D2 sizeMax resistance (straight length)Each elbow or bend adds
G1/215 mm22 mmup to 9 m0.8 m
G1/215 mm28 mmup to 18 m1.0 m
G1/215 mm35 mmup to 27 m1.4 m
G3/422 mm28 mmup to 9 m1.0 m
G3/422 mm35 mmup to 18 m1.4 m
G3/422 mm42 mmup to 27 m1.7 m
G128 mm35 mmup to 9 m1.4 m
G128 mm42 mmup to 18 m1.7 m
G128 mm54 mmup to 27 m2.3 m

Worked example

A cylinder has a G1/2 temperature and pressure relief valve. The D2 run is 7 m of straight pipe with four elbows. Try 22 mm first. Four elbows at 0.8 m each add 3.2 m, so the total is 10.2 m. That is over the 9 m limit for 22 mm. Try 28 mm. Four elbows at 1.0 m each add 4 m, so the total is 11 m. That is within the 18 m limit, so 28 mm copper is the right size for D2.

Where the discharge pipe can terminate

Paragraph 3.61 says the discharge must end somewhere safe where people nearby are not at risk. Paragraph 3.62 gives examples of acceptable terminations, listed below. Paragraph 3.63 warns that the discharge can be steam and very hot water, which can damage asphalt, roofing felt and non-metallic rainwater goods.

  • Into a trapped gully, with the pipe end below a fixed grating and above the water seal
  • Downwards at low level, no more than 100 mm above an external surface such as a car park, hard standing or grass, with a wire cage or similar guard to stop children touching it
  • At high level into a metal hopper and metal downpipe, with the end of the discharge pipe clearly visible
  • Onto a roof that can take high-temperature water, at least 3 m from any plastic guttering

Sharing a discharge pipe or using the soil stack

Under paragraph 3.59, several unvented systems can share one discharge pipe if it is at least one size larger than the largest individual D2 connected to it. Under paragraph 3.60, discharging into a soil stack is allowed only if the stack can safely take the discharge temperature. The connection then needs a mechanical seal without a water trap, a separate branch with no sanitary appliances on it, and the pipe must be continuously marked to say no sanitary appliances may be connected. Plastic branches must be polybutylene or cross-linked polyethylene to Class S of BS 7291. If in doubt, take it to an outside gully instead.

Notification and labelling

Installing an unvented hot water system is notifiable building work (paragraph 3.41). Installers registered with a competent person scheme self-certify without notifying in advance (3.42). Anyone else must notify building control before starting. The unit must carry the indelible warning marking described in paragraph 3.24. A notice of commissioning goes to building control within 5 days of commissioning where a building notice or full plans applies, or within 30 days of completion for scheme members (paragraphs 3.77 and 3.78).

Official sources

Practise for it

Test yourself with a free timed mock, with every answer explained.

Start a free mock

Frequently asked questions

How far can the tundish be from the relief valve?

No more than 600 mm of pipe between the valve outlet and the tundish, according to Approved Document G paragraph 3.54. The tundish must be vertical, as close as possible to and below the valve, and in the same space as the unvented system.

How long must the vertical drop below the tundish be?

At least 300 mm of vertical D2 pipe below the tundish before any bend or elbow. After that the pipe needs a continuous fall of at least 1 in 200.

What size should the D2 discharge pipe be?

At least one size larger than the valve outlet, so 22 mm for a G1/2 valve, if the total resistance is no more than 9 m of straight pipe. Each further 9 m (up to 27 m) needs one more size, using Table 3.1 of Approved Document G.

Can the D2 pipe be plastic?

Only if the plastic has been shown to withstand the discharge temperature and is marked with its product and performance standard. Metal, usually copper, is the normal choice.

Do I need a G3 qualification to fit an unvented cylinder?

Approved Document G paragraph 3.40 says competence can be shown by registration with a competent person scheme or by holding a current registered operative skills card for unvented systems. In practice that means completing a G3 unvented course. You can practise the G3 exam with our free unvented mock.

Related

Sources: Approved Document G: Sanitation, hot water safety and water efficiency (Planning Portal, links to the gov.uk PDFs); Approved Document G 2024 amendment booklet (gov.uk). This guide paraphrases the rules for revision; always work from the current official documents.