Part P notifiable work: which electrical jobs need notifying

Updated 30 October 2026. Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

In England, three kinds of electrical work in a home are notifiable under Part P: installing a new circuit, replacing a consumer unit, and adding to or altering a circuit in a special location such as the area around a bath or shower. Everything else, including replacements, repairs and additions outside special locations, is not notifiable but still has to meet BS 7671 and be certificated. Notifiable work is either self-certified through a competent person scheme, checked by a registered third-party certifier, or notified to building control before it starts.

What Part P actually requires

Part P of the Building Regulations 2010 has one requirement, P1. Reasonable provision must be made in the design and installation of electrical installations to protect people from fire and injury. The current guidance in England is Approved Document P, 2013 edition. It covers dwellings and their gardens, outbuildings such as sheds, detached garages and greenhouses, and the common parts of flats such as corridors, stairs and shared laundries.

The approved document points to BS 7671 as the way to meet P1. That applies to all electrical work in a dwelling, notifiable or not. Notification only decides who checks the work. It does not lower the standard for work that is not notifiable.

The three types of notifiable work

Regulation 12(6A) of the Building Regulations 2010 lists the notifiable work. Approved Document P repeats it at paragraph 2.5.

  • Installing a new circuit, including circuits to outbuildings, garden lighting and EV charge points
  • Replacing a consumer unit
  • Any addition or alteration to an existing circuit in a special location

What counts as a special location?

Regulation 12(9) defines two kinds of special location, and Approved Document P illustrates them at paragraph 2.6. The first is a room containing a swimming pool or a sauna heater. The second is the space around a bath or shower. It runs from finished floor level up to 2.25 m, or up to the height of the shower head if that is higher. Horizontally it extends 0.6 m from the edge of the bath or shower tray, or 1.2 m from the centre of the shower head where there is no tray, such as a wet room.

Work elsewhere in the bathroom, outside that space, is not notifiable in England unless it involves a new circuit. This is a Building Regulations definition. For the BS 7671 bathroom zones, which you need for the design itself, see our bathroom zones guide.

Notifiable and non-notifiable examples

These examples follow paragraphs 2.5 to 2.8 of Approved Document P. If a job needs a new circuit, it is notifiable wherever it is.

JobNotifiable in England?Why
Replacing a consumer unitYesListed in reg 12(6A)
New cooker circuitYesNew circuit
New radial for an EV charger or garden officeYesNew circuit
Electric shower on a new circuitYesNew circuit
Adding a light point within 0.6 m of the bathYesAlteration in a special location
Extra socket spurred from a kitchen ringNoAddition outside a special location (para 2.7)
Like-for-like replacement of a light fitting or socketNoReplacement (para 2.7)
Fitting a built-in cooker to an existing cooker circuitNoNo new circuit needed (para 2.8)
Connecting an electric gate to an existing isolatorNoExample given in para 2.8. A new circuit to the isolator would be notifiable
Replacing a damaged cableNoRepair or replacement (para 2.7)

How to comply: the three routes

Section 3 of Approved Document P sets out three ways to deal with notifiable work. Which one you use depends on whether you belong to a competent person scheme.

RouteWho uses itDeadline
Competent person scheme (self-certification)Installers registered with an authorised scheme, such as those run by Certsure (NICEIC), NAPIT or BESCABuilding regulations compliance certificate to the occupier and certificate to building control within 30 days of completion (ADP para 3.4)
Registered third-party certifierInstallers who are not in a scheme but use a registered certifierCertifier appointed before work starts (para 3.5). Tell the certifier within 5 days of completion (para 3.6)
Building control bodyAnyone else, including DIYBuilding notice or full plans before work starts (paras 2.5 and 3.8). Building control checks the work and normally charges a fee

Paperwork for work that is not notifiable

Non-notifiable work still needs a BS 7671 certificate. Paragraph 3.13 of Approved Document P says it should be designed, installed, inspected, tested and certificated to BS 7671. For an addition or alteration that does not include a new circuit, that normally means a Minor Electrical Installation Works Certificate. For a new circuit, it means an Electrical Installation Certificate. Under paragraph 3.14 the local authority can still take enforcement action against non-notifiable work that is unsafe.

Wales and Scotland

Wales has its own Approved Document P, and its list of notifiable work is wider than England's. The Welsh Government says minor work such as adding a fused spur or replacing an accessory is only exempt when it is not in a kitchen, a bathroom or outdoors. Check the Welsh document before working there. Scotland does not use Part P. Electrical safety there comes under the Building (Scotland) Regulations and standard 4.5 of the Scottish Building Standards Technical Handbooks.

Other Approved Documents electricians must not breach

The City & Guilds 2393-10 exam covers the parts of the Building Regulations most relevant to electrical work in dwellings, not just Part P. When you run cables or fit accessories, make sure you do not undermine any of the following.

  • Part A (structure): do not weaken joists or walls when notching, drilling or chasing
  • Part B (fire safety): fire stopping where cables pass through fire-separating walls and floors
  • Part E (sound): sealing penetrations so you keep the sound insulation between dwellings
  • Part F (ventilation): extract fans in kitchens and bathrooms
  • Part L (energy): efficient lighting and controls in new work
  • Part M (access): switch and socket heights in new dwellings
  • Part S (EV charging): charge points or cable routes for new homes in England

Official sources

Practise for it

Test yourself with a free timed mock, with every answer explained.

Start a free mock

Frequently asked questions

Is adding a socket notifiable under Part P?

Not in England, unless the work is in a special location such as within 0.6 m of a bath or shower tray, or it needs a new circuit. It still needs a Minor Works Certificate to BS 7671. In Wales, adding a socket in a kitchen, bathroom or outdoors is notifiable.

Is replacing a consumer unit notifiable?

Yes. Replacing a consumer unit is one of the three notifiable types of work listed in regulation 12(6A), even if every circuit stays the same.

How long do I have to notify Part P work?

A competent person scheme member must give the occupier a compliance certificate and give building control the certificate within 30 days of completing the work. Without a scheme or a third-party certifier, you must notify building control before work begins.

Can a homeowner do notifiable electrical work themselves?

Yes, but they must send a building notice or full plans to building control before starting. Building control then checks the work, normally for a fee. The work must still meet BS 7671.

What is the 2393-10 exam?

City & Guilds 2393-10 is the Level 3 Certificate in the Building Regulations for Electrical Installations in Dwellings. It is an open-book, multiple-choice online test on Part P and the other relevant Approved Documents. You can practise it with our free 2393-10 mock.

Related

Sources: Approved Document P: Electrical safety in dwellings, 2013 edition (gov.uk PDF); Approved Document P (Wales), Welsh Government; Competent person schemes: current schemes (gov.uk); Building standards technical handbook 2022: domestic, 4.5 Electrical safety (gov.scot). This guide paraphrases the rules for revision; always work from the current official documents.