Bathroom zones explained: 0, 1 and 2

Updated 15 October 2026. Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

Bathrooms and shower rooms are special locations in BS 7671 (Section 701), because wet skin makes electric shock far more dangerous. The room is divided into zones around the bath or shower, and each zone has its own rules for what can be installed.

Here are the zones, the IP ratings, and the rules on RCDs, sockets and bonding.

Bathroom zones diagram

2.25 m0.6 mZone 1Zone 0 (inside bath)Zone 2FloorOutside the zones
Side view, not to scale. Zone 1 goes higher than 2.25 m if a fixed shower head or water outlet is above that height. Zone 2 runs 0.6 m out from the edge of zone 1, up to the same height.

Common items: which zone can they go in?

ItemZone 0Zone 1Zone 2Outside the zones
Electric shower or shower pump (fixed, suitable for the zone)NoYesYesYes
Extractor fan (fixed, at least IPX4)NoYesYesYes
Downlight or other luminaire (fixed, at least IPX4)NoYesYesYes
Heated towel rail (fixed, suitable for the zone)NoYesYesYes
Shaver supply unit to BS EN 61558-2-5NoNoYes, away from direct sprayYes
SELV equipment, max 12 V AC or 30 V ripple-free DCOnly if made for zone 0YesYesYes
Cord of a pull-cord switch (switch body outside zones 0 and 1)NoYesYesYes
13 A socket-outletNoNoNoOnly 2.5 m or more from the zone 1 boundary

Every circuit in the room still needs 30 mA RCD protection, whichever zone the item is in. A common exam trap: the 2.5 m socket distance is measured from the edge of zone 1, not from the bath itself.

The zones

ZoneWhere it isMinimum IP rating
Zone 0Inside the bath or shower trayIPX7
Zone 1Above zone 0, up to 2.25 m from the finished floor (or the highest fixed shower head or water outlet if higher)IPX4
Zone 20.6 m horizontally beyond zone 1, up to the same heightIPX4
Outside the zonesThe rest of the roomNo special requirement, but sockets have distance limits

Where there's no shower tray, as in a wet room, zone 1 is measured as 1.2 m horizontally from the fixed water outlet. The space under a bath is zone 1 if it can be reached without a tool, and outside the zones if a tool is needed to open it.

What can go where

  • Zone 0: only fixed equipment designed for it, supplied by SELV at no more than 12 V AC or 30 V ripple-free DC, with the safety source outside zones 0, 1 and 2.
  • Zone 1: fixed equipment suitable for the zone, such as electric showers, shower pumps, whirlpool units, ventilation, towel rails, water heaters and luminaires, as well as SELV equipment at up to 12 V AC or 30 V DC.
  • Zone 2: as zone 1, plus shaver supply units to BS EN 61558-2-5 where they aren't likely to be hit by direct spray.
  • Switches: pull-cord switches can be used inside the zones; other switchgear must be outside zones 0 and 1, apart from SELV switches.

RCDs, sockets and bonding

  • All circuits of the location need additional protection by a 30 mA RCD.
  • Socket-outlets, except SELV and shaver supply units, must be at least 2.5 m from the boundary of zone 1.
  • Supplementary bonding may be omitted where all circuits have 30 mA RCD protection, disconnection times are met, and all extraneous-conductive-parts are connected to main bonding.

Practise for it

Special locations, and bathrooms in particular, are a favourite in the 18th Edition exam. Practise with timed mocks.

Frequently asked questions

What are the bathroom zones?

Zone 0 is the inside of the bath or shower tray. Zone 1 is directly above it, up to 2.25 m from the floor. Zone 2 extends 0.6 m out from zone 1, up to the same height. Everything else in the room is outside the zones.

What IP rating do you need in zone 1 and zone 2?

At least IPX4. Where water jets are likely to be used for cleaning, such as in communal showers, IPX5. In zone 0, equipment must be at least IPX7.

How far must a socket be from a bath or shower?

Socket-outlets, other than SELV sockets and shaver supply units, must be at least 2.5 m horizontally from the boundary of zone 1.

Do all bathroom circuits need RCD protection?

Yes. All circuits of the location must have additional protection by a 30 mA RCD.

Is supplementary bonding still needed in bathrooms?

It can be left out if all circuits in the location are protected by a 30 mA RCD, the circuits meet the disconnection times, and all extraneous-conductive-parts are connected to the main protective bonding. Otherwise it is required.

Related

Sources: BS 7671:2018 as amended, Section 701 (Locations containing a bath or shower). FreeMocks is independent and not affiliated with the IET or BSI. Check the edition and amendment you are working to.