EV charger installation regulations: what Section 722 requires

Updated 30 October 2026. Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

In the UK, an EV charge point has to be installed to BS 7671 Section 722. That means its own final circuit, individual 30 mA RCD protection with protection against DC fault current, and a safe earthing arrangement where the supply is PME. Home and workplace charge points sold in Great Britain must also meet the Electric Vehicles (Smart Charge Points) Regulations 2021, and in England a new circuit is notifiable under Part P. The IET Code of Practice for EV Charging Equipment Installation (5th edition) explains how to apply all of this on site.

Which rules apply to a charge point installation?

Several sets of rules apply to a typical home or workplace charge point. BS 7671 Section 722 sets the electrical safety requirements and the IET Code of Practice gives the practical method. The smart charge point regulations control which charger you can supply, the Building Regulations cover notification, and the DNO needs to know about the extra load. The 2921-34 exam expects you to know which document answers which question.

DocumentWhat it covers for EV work
BS 7671:2018+A4:2026, Section 722Circuit, RCD, PME earthing, external influence and AFDD requirements for charging installations
IET Code of Practice for EV Charging Equipment Installation, 5th edPractical guidance: PME options, TT electrode separation, risk assessment checklists, cable selection
Electric Vehicles (Smart Charge Points) Regulations 2021Smart functions, default off-peak charging, randomised delay, measuring system, security
Building Regulations Part P (England)A new circuit for a charger is notifiable work
Building Regulations Part S (England)Charge points or cable routes for new homes and some major renovations
DNO connection processNotifying or applying to the network operator for the added load

Dedicated circuit and RCD protection

Regulation 722.533.101 requires each charging point to be supplied individually by a final circuit with its own overcurrent protective device, so you cannot spur a charger from a socket or the ring. A single piece of charging equipment may have more than one charging point. The Code of Practice (para 8.3.3) says final circuits should not have diversity applied unless automatic controls curtail the demand, so size the cable for the full charging current.

Regulation 722.531.3.101 requires each charging point with a BS EN IEC 62196 socket-outlet or connector to have its own RCD of 30 mA or less, which must be Type A, Type F, Type B or an RDC-PD to BS IEC 62955. Type AC is not on that list. Unless the charging equipment already provides it, you also need protection against DC fault current: a Type B RCD, a Type A or Type F RCD with an RDC-DD, or an RDC-PD. A note to the regulation allows the RDC-DD to sit inside the charger with the Type A or F RCD upstream. The Code of Practice puts the threshold at smooth DC above 6 mA. Regulation 722.531.3.1 adds that the RCD must disconnect all live conductors, neutral included.

  • One final circuit per charging point (722.533.101)
  • 30 mA RCD per charging point: Type A, F, B or RDC-PD (722.531.3.101)
  • DC fault protection: Type B RCD, Type A or F plus an RDC-DD, or an RDC-PD, unless built into the charger
  • The RCD must switch the neutral as well as the line (722.531.3.1)
  • Notes to Figure A53.2 in BS 7671 say a Type A RCD should not be fitted upstream of a Type F or Type B unless the RCD manufacturer declares the arrangement suitable

PME earthing and Regulation 722.411.4.1

The main hazard on a PME (TN-C-S) supply is a broken PEN conductor in the network. If the PEN opens, the earthing terminal and every exposed metal part connected to it can rise to a dangerous voltage, and an RCD gives no protection against this. A car on charge outside is a large metal part that someone can touch while standing on true earth. So Regulation 722.411.4.1 does not let you use a PME earthing facility for a charging point that is outdoors, or that might reasonably be used to charge a vehicle outdoors, unless one of its listed methods is used.

The rule does not apply where the vehicle can only be charged inside a building, for example in a garage with a tethered lead that will not reach outside. The Code of Practice (para 6.6.2.1) confirms the PME earth can be used in that case. Where PME cannot be used, the Code of Practice also allows a TT arrangement or electrical separation (one vehicle per isolating transformer, Regulation 722.413.1.2). The circuit supplying the charger must not include a PEN conductor (722.312.2.1).

Option in 722.411.4.1 (A4)How it worksPractical notes
(a) DeletedThe old balanced three-phase option was removed by A2:2022Do not rely on load balance alone. It is no longer a listed method
(b) Installation earth electrodeThe main earthing terminal is also connected to an earth electrode with a resistance low enough to keep the voltage to Earth at or below 70 V rms if the PEN opensBS 7671 Annex A722 (A722.3) gives the formula. The Code of Practice says a low enough value is generally not practicable on single-phase installations
(c) Open PEN device (voltage to Earth)Measures the voltage between the circuit protective conductor and Earth and disconnects live conductors and earth within 5 s if it exceeds 70 V rmsCan reset only once the voltage is back at or below 70 V rms. The Code of Practice says a measurement electrode should be at least 2 m from buried metalwork and set to 40 V rms or less
(d) Open PEN device (line to neutral voltage)Disconnects when the voltage at the charging point goes above 253 V or below 207 V rmsCan reset only within 207 to 253 V. BS 7671 no longer limits this to single-phase, but the Code of Practice warns it can miss some faults on three-phase networks and recommends limiting voltage drop to the charger to 4%
(e) Alternative deviceAny other device giving no lesser degree of safety than (c) or (d)Must disconnect the vehicle from live conductors and earth and provide isolation
TT system for the charging point (Code of Practice 5.3.3)Charging point earthed by its own electrode, not by PMEElectrode at or below 200 ohms, RCD protection, a warning notice and a risk assessment. Keep the electrode at least 2.5 m below ground from PME-connected buried metalwork (CoP Appendix G, Table G.1). Often not practicable on small plots

What Amendment 4:2026 means for EV work

BS 7671:2018+A4:2026 was issued on 15 April 2026, and the previous version (A2:2022 with A3:2024) was withdrawn on 15 October 2026. The A4 summary of main changes does not list Section 722 itself, so the charge point rules above carry over. The changes that matter for EV work sit elsewhere in the book.

A new Chapter 57 covers stationary secondary batteries, which you need for vehicle-as-storage and home battery designs. Regulation 551.7.1 now requires a suitable protective device where energy flow is bidirectional, and 551.7.2.1 treats stationary batteries as a generating set rather than a load. Regulation 530.3.201, which arrived with A3:2024, asks you to choose between unidirectional and bidirectional protective devices. That matters if the car can export power (vehicle to home or vehicle to grid), because some RCDs, RCBOs and AFDDs are marked for supply in one direction only.

On AFDDs, Regulation 722.421.1.7.201 says they are not required for circuits supplying charging equipment to the BS EN 61851 series with socket-outlets or connectors to BS EN IEC 62196-2.

Smart charge point rules

Since 30 June 2022, charge points sold in Great Britain for charging cars and vans must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. Public charge points and rapid charge points of 50 kW or more are excluded. You should not supply a non-compliant unit for a home or workplace.

  • Smart functions: the charger must send and receive data over a network and change its charging rate or timing in response (reg 5)
  • Still able to charge if the network connection drops (reg 7)
  • Pre-set default charging hours outside peak times, which are 8am to 11am and 4pm to 10pm on weekdays. The owner must be able to change or remove them and override them (reg 10)
  • Randomised delay of up to 600 seconds by default, with the charger able to go up to 1,800 seconds. The owner can cancel it (reg 11)
  • Measures energy imported or exported and the time taken, and lets the owner view it for each session over the last 12 months (reg 9)

Notifying building control and the DNO

In England, installing a new circuit is notifiable under Part P, so a charge point needs to go through a competent person scheme or a building control body. Registered installers self-certify, and the occupier and building control get the certificate within 30 days of completion. See our guide to notifiable electrical work for the full list.

The DNO also needs to know, using the ENA EV and heat pump form. Thresholds vary by network operator. SSEN, for example, lets you install first and notify within 28 days where the property's total demand including the charger is 60 A or less and the supply is not looped. Above that, or where the supply is shared, you apply and wait for approval before connecting. Load management or a supply upgrade may be needed. Regulation 722.311.201 allows load curtailment to be taken into account in maximum demand.

Inspection, testing and certification

A new charging circuit gets an Electrical Installation Certificate. Test as for any new circuit, including RCD operation. If you used an earth electrode, record its resistance, and record the open PEN method you relied on so the next inspector can see how Regulation 722.411.4.1 was met.

Official sources

Practise for it

Test yourself with a free timed mock, with every answer explained.

Start a free mock

Frequently asked questions

Can I use the PME earth for a home EV charger?

Only if one of the methods listed in Regulation 722.411.4.1 is used, such as an open PEN protection device, which is often built into the charger. The exception is a charging point where the vehicle can only be charged indoors, for example in a garage. Otherwise use a TT earth for the charging point or electrical separation.

What RCD type does an EV charger need?

Each charging point needs its own 30 mA RCD that is Type A, F or B, or an RDC-PD. It also needs protection against DC fault current: a Type B RCD, a Type A or F RCD with an RDC-DD, or an RDC-PD. If the charger already provides the DC protection, a Type A RCD upstream can be used. Check the manufacturer's instructions.

Is fitting an EV charger notifiable under Part P?

Yes in England, because it needs a new circuit. A competent person scheme member self-certifies. Anyone else must notify building control before starting work.

Does an EV charger circuit need an AFDD?

No, where the charging equipment conforms to the BS EN 61851 series and uses socket-outlets or connectors to BS EN IEC 62196-2. Regulation 722.421.1.7.201 says AFDDs are not required in that case.

What is the 2921-34 qualification?

City & Guilds 2921-34 is a Level 3 Award covering the requirements for the design and installation of domestic and small commercial EV charging installations. It ends in an open-book online multiple-choice test. You can practise with our free 2921-34 mock exam.

Related

Sources: The Electric Vehicles (Smart Charge Points) Regulations 2021, Part 2 (legislation.gov.uk); IET Code of Practice for EV Charging Equipment Installation, 5th edition (IET shop); IET press release: Amendment 4:2026 to BS 7671; Approved Document P: Electrical safety in dwellings, 2013 edition (gov.uk). This guide paraphrases the rules for revision; always work from the current official documents.