Q1. A new office building in England is built with 60 parking spaces. Under Part S, what is the minimum provision described in the Code?
Show answer
Answer: D. One charging point and cable routes for at least 12 spaces
- Part S came into force in England on 15 June 2022.
- New or majorly renovated non-residential buildings with at least 10 spaces: a minimum of one charging point and cable routes for at least 20 % of spaces.
- 20 % of 60 = 12.
Residential rules are different: a charge point per dwelling with parking.
Why the others are wrong:
A: non-residential buildings with at least 10 spaces are within Part S.
B: 6 is 10 % of the spaces; the requirement is 20 %.
C: full provision applies to new homes with parking, not to non-residential buildings.
The maths
Spaces = 60, so Part S applies (at least 10)
Cable routes = 20 % x 60 = 0.2 x 60 = 12
Plus a minimum of 1 charging point
Memory trick:
Non-residential: one point, one in five routed.
Find it in the book
IET Code of Practice for EV Charging Equipment Installation, 5th Edition, page 20