2392-10: Requirements and certification practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

15 of our 100 Fundamental Inspection, Testing and Initial Verification (2392-10) questions are on requirements and certification, about 15% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Regulations that come up most

The regulation groups our requirements and certification questions test most often. Know where these are in your book before the exam.

  • 641.3 · 1 questions
  • 641.6 · 1 questions
  • 643.1 · 1 questions
  • 644.1 · 1 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. An electrician who is not in a competent person scheme uses a registered third-party certifier for a new circuit. When must the certifier be appointed, and when told the work is finished?

Show answer

Answer: C. Appointed before work begins, and notified within 5 days of completion

  • AD P 3.5: before work begins, an installer who is not a registered competent person may appoint a registered third-party certifier.
  • AD P 3.6: within 5 days of completing the work, the installer must notify the certifier, who inspects and tests and issues a condition report if satisfactory.
  • AD P 3.7: the certifier's registration body then has 30 days to issue the compliance certificate.

Third-party route: appoint first, notify in 5 days.

Why the others are wrong:

A: the installer must notify within 5 days; 30 days is the registration body's deadline.

B: the certifier must be appointed before work begins.

D: appointment must be before work begins, and notification is within 5 days.

Memory trick:

Third party: book before, tell within five.

Reg Approved Document P, 3.5 and 3.6

Q2. An electrician who is not a registered competent person, and has not appointed a third-party certifier, is installing a new circuit in a flat. What must they do?

Show answer

Answer: D. Notify a building control body before work begins

  • AD P 3.8: if the installer is not a registered competent person and has not appointed a registered third-party certifier, they must notify a building control body before work begins.
  • The building control body decides the extent of inspection and testing needed, and may take the installer's BS 7671 certificate into account.

No scheme and no third party means building control, and they must hear first.

Why the others are wrong:

A: the distributor does not certify Building Regulations compliance.

B: with this route the building control body must be notified before work begins.

C: a new circuit is notifiable work.

Memory trick:

No scheme? Building control, before you start.

Reg Approved Document P, 3.8

Q3. An improver tests a new radial and writes every reading onto the schedule, but nobody checks the readings against any limits. Which part of initial verification has been missed?

Show answer

Answer: C. Comparing the results with the relevant criteria

  • Regulation 641.3: verification must include comparison of the results with relevant criteria to confirm BS 7671 has been met.
  • GN3 places this duty on the party responsible for the inspection and testing, who signs that section of the certificate.

Recording numbers is not verification until someone checks them against the limits.

Why the others are wrong:

A: clients are not required to witness or countersign test readings.

B: BS 7671 does not require tests to be duplicated with another instrument.

D: the distributor plays no part in approving installation test results.

Memory trick:

A reading is just a number until you compare it with the limit.

Find it in the book

BS 7671:2018+A4:2026, page 247; IET Guidance Note 3 (2022 edition), page 22

Reg 641.3

Q4. A builder orders a new circuit in a house that is lived in by its owner. Under the note to Approved Document P 3.2, who normally receives the electrical certificate and who the Building Regulations certificate?

Show answer

Answer: A. The builder gets the EIC; the occupier gets the Building Regulations certificate

  • AD P 3.2 note: electrical inspection and test forms go to the person ordering the work.
  • Building Regulations certificates should normally go to the occupier (for rented property they may go to the person ordering the work and be copied to the occupier).

The EIC follows the order; the compliance certificate follows the occupier.

Why the others are wrong:

B: Building Regulations certificates should normally go to the occupier.

C: the inspection and test forms go to the person ordering the work.

D: this reverses who receives each document.

Memory trick:

Test forms to whoever ordered; Building Regs certificate to whoever lives there.

Reg Approved Document P, 3.2 note

Q5. A new installation already has its RCD test notice and circuit chart fitted. Which other label from item 11 (identification and notices) of the inspection checklist should you look for?

Show answer

Answer: D. The next inspection recommendation label

  • Item 11 of the checklist covers notices such as the RCD six-monthly test notice, diagrams and charts, alternative supply warnings and the next inspection recommendation label (514.12.1).
  • The label tells the user when the installation should next be inspected.

The date on the EIC should also appear on a label at the installation.

Why the others are wrong:

A: the checklist does not call for a connected load label.

B: this is not a BS 7671 notice and is not on the checklist.

C: this is not one of the checklist items.

Memory trick:

Notices check: test it, chart it, date it.

Find it in the book

BS 7671:2018+A4:2026, page 544

Reg Appendix 6 checklist item 11.5; 514.12.1

Q6. A new detached garage is supplied as a TT installation with its own earth rod. Besides the dead tests of Regulations 643.2 to 643.6, which test must BS 7671 have carried out before the installation is energized?

Show answer

Answer: D. Earth electrode resistance

  • Regulation 643.1: the tests of 643.2 to 643.6 (continuity, insulation resistance, SELV/PELV/separation, floors and walls, polarity) are done in that order before the installation is energized.
  • Where the installation includes an earth electrode, the electrode test of 643.7.2 must also be done before energizing.

A TT installation relies on its rod, so the rod is proved before any supply is connected.

Why the others are wrong:

A: phase sequence is a live check for multiphase circuits, not a pre-energizing test.

B: RCD trip-time tests need the supply connected, so they follow energizing.

C: Zs is measured with the supply on, after energizing.

Memory trick:

Got a rod? Prove the rod before power goes on.

Find it in the book

BS 7671:2018+A4:2026, page 248

Reg 643.1

Want 94 more 2392-10 questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other 2392-10 topics

Revise this topic