18th Edition: Definitions practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

40 of our 1,080 18th Edition Wiring Regulations (2382-26) questions are on definitions, about 4% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. What is a distribution circuit?

Show answer

Answer: B. A circuit supplying a distribution board or switchgear

  • A distribution circuit supplies a distribution board or switchgear.
  • It can also connect the origin to an outlying building or separate installation.
  • A final circuit feeds current-using equipment or outlets directly.

Why the others are wrong:

A: that's a final circuit.

C: that's part of the supply, not the installation.

D: that's a type of final circuit.

Memory trick:

Distribution feeds boards. Final feeds things.

Reg Part 2

Q2. Which Part 2 term describes an operation intended to remove, as quickly as possible, a danger that may have arisen unexpectedly?

Show answer

Answer: B. Emergency switching

  • Emergency switching is an operation intended to remove, as quickly as possible, danger which may have occurred unexpectedly.
  • Emergency stopping is emergency switching intended to stop an operation.

The key words are speed and the unexpected nature of the danger.

Why the others are wrong:

A: isolation makes an installation dead for safety before work, not a rapid response to danger.

C: functional switching is for normal operating purposes.

D: ADS is a protective measure against shock, not the defined switching term.

Memory trick:

Emergency = Eliminate danger, Express.

Reg Part 2 (Emergency switching)

Q3. Fault protection is protection against electric shock under which conditions?

Show answer

Answer: A. Single fault conditions

  • Fault protection is protection against electric shock under single fault conditions.
  • For LV installations this generally means protection against contact with exposed-conductive-parts that have become live under fault conditions.

Basic protection covers normal (fault-free) conditions; fault protection takes over when something goes wrong.

Why the others are wrong:

B: that is basic protection.

C: the definition refers to a single fault, not two faults together.

D: overload is an overcurrent matter, not part of the shock protection definition.

Memory trick:

Basic = Before a fault. Fault = First fault.

Reg Part 2 (Fault protection)

Q4. Overcurrent is a current exceeding the rated value. For a conductor, what is that rated value?

Show answer

Answer: C. Its current-carrying capacity

  • Overcurrent is a current exceeding the rated value.
  • For conductors, the rated value is the current-carrying capacity (Iz).
  • Overcurrent covers both overload and short-circuit current.

So a conductor is in overcurrent whenever it carries more than its current-carrying capacity.

Why the others are wrong:

A: the definition sets the conductor's rated value as its current-carrying capacity, not the device rating.

B: design current is the current to be carried in normal service, not the conductor's rated value.

D: prospective fault current is a fault value, not a rating.

Memory trick:

Over the cable's Iz = overcurrent.

Reg Part 2 (Overcurrent)

Q5. According to the Part 2 definition, which conductors connect the means of earthing via the main earthing terminal (MET)?

Show answer

Answer: B. Protective conductors, bonding conductors and any functional earthing conductors

  • The MET is the terminal or bar for connecting protective conductors to the means of earthing.
  • This includes protective bonding conductors and conductors for functional earthing, if any.

The MET is the single gathering point between the installation's protective conductors and the means of earthing.

Why the others are wrong:

A: the definition specifically includes conductors for functional earthing, if any.

C: protective bonding conductors are named in the MET definition.

D: line and neutral conductors are live conductors and do not connect to the MET.

Memory trick:

MET = Meeting point for Every earth and bond.

Reg Part 2 (Main earthing terminal)

Q6. A circuit-breaker with a breaking capacity of 6 kA is downstream of a 100 A fuse. For faults up to 2.5 kA only the circuit-breaker opens, but above 2.5 kA both devices operate. Which term describes this?

Show answer

Answer: A. Partial selectivity

  • Selectivity: only the intended device operates within stated limits.
  • Partial selectivity: selectivity up to an overcurrent lower than the breaking capacity of the downstream device (here up to 2.5 kA, below 6 kA).
  • Total selectivity: selectivity for all overcurrents up to the downstream device's breaking capacity.

Because selectivity is lost above 2.5 kA, well short of 6 kA, it is only partial.

Why the others are wrong:

B: total selectivity would need only the downstream device to operate for all overcurrents up to its 6 kA breaking capacity.

C: that describes two OCPDs raising the short-circuit capability together, not which device opens first.

D: that is a withstand value for equipment protected by a specified device, not a description of device coordination.

Memory trick:

Total goes all the way to the breaking capacity; partial stops short.

Find it in the book

BS 7671:2018+A4:2026, page 44

Reg Part 2 (Selectivity, partial)

Want 1,074 more 18th Edition questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other 18th Edition topics

Revise this topic