Q1. A kitchen fitter installs a prefabricated under-cabinet lighting kit joined by plug and socket connectors, fed from an existing fused spur. What is its status under Part P?
Show answer
Answer: B. Within the scope of Part P but not notifiable here
- Prefabricated modular wiring linked by plug and socket connectors is within the scope of Part P.
- It is notifiable only if it involves regulation 12(6A) work (new circuit, consumer unit, special location).
Fed from an existing spur in a kitchen, it is in scope but not notifiable.
Why the others are wrong:
A: modular wiring with plug and socket connectors is still within the scope of Part P.
C: it is only notifiable if it involves regulation 12(6A) work such as a new circuit.
D: Part P applies to both low and extra-low voltage installations.
Memory trick:
Plug-together does not mean Part P-free.
