Part P 2393-10: Part P: electrical safety in dwellings practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

34 of our 160 Building Regulations for Electrical Installations in Dwellings (Part P) (2393-10) questions are on part p: electrical safety in dwellings, about 21% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. A kitchen fitter installs a prefabricated under-cabinet lighting kit joined by plug and socket connectors, fed from an existing fused spur. What is its status under Part P?

Show answer

Answer: B. Within the scope of Part P but not notifiable here

  • Prefabricated modular wiring linked by plug and socket connectors is within the scope of Part P.
  • It is notifiable only if it involves regulation 12(6A) work (new circuit, consumer unit, special location).

Fed from an existing spur in a kitchen, it is in scope but not notifiable.

Why the others are wrong:

A: modular wiring with plug and socket connectors is still within the scope of Part P.

C: it is only notifiable if it involves regulation 12(6A) work such as a new circuit.

D: Part P applies to both low and extra-low voltage installations.

Memory trick:

Plug-together does not mean Part P-free.

Reg Approved Document P, 2.9

Q2. A faulty electric shower is replaced with a new unit of the same rating, connected to the existing circuit and isolator with no change to the circuit. Using the Approved Document P guidance, how is this classed?

Show answer

Answer: A. Non-notifiable, because it is a replacement

  • Paragraph 2.7: all work not listed in regulation 12(6A) is non-notifiable, including replacements, repairs and maintenance anywhere.
  • A like-for-like replacement on the existing circuit is a replacement, not an addition or alteration.

It must still comply with BS 7671 and be tested and certificated.

Why the others are wrong:

B: the guidance says replacements, repairs and maintenance are not notifiable anywhere, including special locations.

C: no new circuit is being installed here; the existing one is reused.

D: the age of the old unit is irrelevant to notification.

Memory trick:

Swap like for like: certify it, no need to notify.

Reg Approved Document P, 2.7

Q3. An electrician adds a socket to an existing circuit in a bedroom, which is non-notifiable. What does Approved Document P expect regarding inspection, testing and certification?

Show answer

Answer: D. It should be inspected, tested and certificated to BS 7671

  • Non-notifiable work, like notifiable work, should be designed, installed, inspected, tested and certificated to BS 7671.
  • The difference is only that it does not need to be notified to building control.

A minor works certificate would typically be used for an added socket.

Why the others are wrong:

A: the guidance expects full BS 7671 inspection, testing and certification.

B: non-notifiable work must still be inspected and tested to BS 7671.

C: building control is not involved in non-notifiable work.

Memory trick:

Not notifiable does not mean not certified.

Reg Approved Document P, 3.13

Q4. In a new dwelling, what mounting height range does the guidance give for wall switches and socket-outlets, measured from finished floor level?

Show answer

Answer: A. 450 mm to 1200 mm

  • In new dwellings, switches and socket-outlets should be between 450 mm and 1200 mm above finished floor level (Part M).
  • This applies to new dwellings only, not to work in existing homes.

The aim is easy reach for people of differing abilities.

Why the others are wrong:

B: 150 mm is too low for the accessible range recommended for new dwellings.

C: this is the suggested height for consumer unit switches, not sockets and switches.

D: this range is wider than the guidance gives.

Memory trick:

Sockets and switches: 450 to 1200, within reach of all.

Reg Approved Document P, 1.4 Note

Q5. A homeowner has a small detached shed fed by a submain from the house consumer unit. Schedule 2 normally exempts small detached buildings. Does Part P apply to new electrical work in the shed?

Show answer

Answer: B. Yes, because the shed shares its electricity with the dwelling

  • Schedule 2 exempts some buildings such as small detached buildings.
  • But by regulation 9(3), conservatories, porches, greenhouses, garages and sheds that share their electricity with a dwelling are not exempt from Part P.

The shed installation must comply with Part P.

Why the others are wrong:

A: the exemption does not extend to Part P where the electricity is shared with a dwelling.

C: sleeping accommodation affects the Schedule 2 exemption, but the shared supply already brings in Part P.

D: no area threshold applies here; the shared supply is what matters.

Memory trick:

Exempt building, shared supply: Part P still follows the cable.

Reg Approved Document P, 2.3 Note

Q6. A wet room has a ceiling-mounted shower head but no shower tray. A customer wants a new light added to an existing circuit, positioned 1.0 m horizontally from the centre point of the shower head. Is this notifiable?

Show answer

Answer: C. Yes, it is within 1.2 m of the shower head centre point

  • With no bath or tray, the horizontal limit is 1.2 m from the centre point of the shower head.
  • The light at 1.0 m is inside that distance.

An addition to an existing circuit within the special location is notifiable.

Why the others are wrong:

A: a room with a shower is covered even without a tray; the zone is simply measured differently.

B: 0.6 m is measured from the edge of a bath or tray; with no tray the distance is 1.2 m from the shower head centre.

D: only work inside the defined space is notifiable, not the whole wet room.

The maths

  1. No tray, so measure from the centre point of the shower head.
  2. Horizontal limit = 1.2 m.
  3. Proposed light at 1.0 m: 1.0 m < 1.2 m, so it is inside the special location.
  4. Addition to an existing circuit in a special location = notifiable.

Memory trick:

No tray? Double the reach: 1.2 m from the shower head.

Reg Approved Document P, 2.5 (reg 12(9)(a)(ii))