2391-52: Requirements, certification and reporting practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

121 of our 480 Inspection and Testing (2391-52) questions are on requirements, certification and reporting, about 25% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Regulations that come up most

The regulation groups our requirements, certification and reporting questions test most often. Know where these are in your book before the exam.

  • 644.4 · 6 questions
  • 132.16 · 2 questions
  • 644.1 · 2 questions
  • 444 · 1 questions
  • 643.1 · 1 questions
  • 644.5 · 1 questions
  • 651.1 · 1 questions
  • 651.3 · 1 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. What is the recommended maximum interval between periodic inspections of a construction site installation?

Show answer

Answer: B. 3 months

  • Table 3.2: Construction site installations: routine check 3 months, maximum interval 3 months.

Sites are rough, changing environments, so frequent checks are needed.

Why the others are wrong:

A: 6 months is for caravan parks' routine checks.

C: 1 year is too long for the harsh site environment.

D: 3 years is for industrial and agricultural premises.

Memory trick:

Building site: every season.

Find it in the book

IET Guidance Note 3 (2022 edition), page 116

Reg GN3 Table 3.2

Q2. A hotel's general electrical installation is due an EICR. What does GN3 say about its fire alarm and emergency lighting systems?

Show answer

Answer: C. They need separate inspection and testing by specialists

  • GN3 deals with periodic inspection of general installations.
  • Plant controls, fire alarms and emergency lighting also need separate periodic inspection and testing by specialists.
  • Table 3.2 points to BS 5839-1 and BS 5266-1 for these.

An EICR does not sign off life-safety systems.

Why the others are wrong:

A: the type of supply does not remove the need for specialist inspection.

B: GN3 says these specialist parts need separate inspection and testing.

D: their inspection does not depend on the EICR outcome.

Memory trick:

EICR covers the wiring, specialists cover the life-safety kit.

Find it in the book

IET Guidance Note 3 (2022 edition), page 115

Reg GN3 3.7

Q3. When can a cross be entered in the polarity column of the schedule of test results?

Show answer

Answer: A. Only where the schedule accompanies an EICR

  • Tick the polarity cell when polarity has been confirmed.
  • A cross may be used to show incorrect polarity only where the form accompanies an EICR.

On new work, the fault must be corrected before certification, so a cross has no place on an EIC.

Why the others are wrong:

B: an EIC should not be issued with incorrect polarity left in place.

C: a cross indicates incorrect polarity, not an untested circuit.

D: the cross is described for schedules attached to an EICR.

Memory trick:

A cross is for a report, never a certificate.

Reg GN3 5.6

Q4. The main switch of a new installation is a 100 mA time-delayed RCD. Besides its rating, what does the EIC ask you to record about it?

Show answer

Answer: A. Its RCD Type, IΔn, time delay and measured operating time

  • Section G main switch: location, BS (EN), poles, current and voltage rating.
  • If it is an RCD: RCD Type (AC, A, F, B or other), rated residual operating current IΔn, rated time delay and measured operating time.
  • Adjustable device settings can go on a continuation sheet.

An RCD main switch is a key part of fault protection, so its full characteristics are recorded.

Why the others are wrong:

B: the form asks for operating characteristics, not production details.

C: Section G asks for the measured operating time of an RCD main switch.

D: electrode resistance is recorded separately under means of earthing.

Memory trick:

RCD main switch: Type, Trip current, Time delay, Time measured.

Find it in the book

BS 7671:2018+A4:2026, page 538

Reg Appendix 6 (EIC Section G)

Q5. Which of these is NOT listed by GN3 as a responsibility of the inspector?

Show answer

Answer: C. Redesigning the installation to remove non-compliances found

  • Inspector duties include: prevent danger, compare results with design, BS 7671 and records, confirm compliance or non-compliance, take a view on related issues such as fire stopping or distributor equipment, and report on condition.
  • The inspector does not take over the designer's or installer's responsibilities or fix their problems.

The inspector verifies and reports; others put things right.

Why the others are wrong:

A: this is listed as one of the inspector's duties.

B: the condition of building fabric, such as fire stopping, is listed.

D: taking a view and reporting on condition is a listed duty.

Memory trick:

Inspectors spot it and report it, they don't redesign it.

Find it in the book

IET Guidance Note 3 (2022 edition), page 15

Reg GN3 1.2

Q6. From which date did the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to existing tenancies?

Show answer

Answer: C. 1 April 2021

  • New tenancies: from 1 July 2020.
  • Existing tenancies: from 1 April 2021.
  • An EICR is needed at intervals of not more than 5 years, or shorter if the inspector says so.

New lets first, existing lets nine months later.

Why the others are wrong:

A: this is when they applied to new tenancies, not existing ones.

B: this is not the start date in the Regulations.

D: this is before the Regulations took effect.

Memory trick:

New in July, everyone by April.

Find it in the book

IET Guidance Note 3 (2022 edition), page 16

Reg GN3 1.3.2

Want 474 more 2391-52 questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other 2391-52 topics

Revise this topic