94 of our 480 Inspection and Testing (2391-52) questions are on inspection, about 20% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Regulations that come up most

The regulation groups our inspection questions test most often. Know where these are in your book before the exam.

  • 527.2 · 4 questions
  • 521.10 · 3 questions
  • 522.6 · 3 questions
  • 543.3 · 3 questions
  • 559.5 · 3 questions
  • 701.512 · 3 questions
  • 418.3 · 2 questions
  • 443 · 2 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. In domestic premises, what must the enclosure of a consumer unit be made from?

Show answer

Answer: C. Non-combustible material, such as ferrous metal

Consumer units and similar switchgear in domestic premises must have enclosures made of non-combustible material, or be inside a cabinet made of non-combustible material. This limits fire spread if something overheats inside.

Why the others are wrong:

A: plastic enclosures don't meet the requirement on their own.

B: wood is combustible.

D: the door material doesn't change the rule.

Memory trick:

Steel in the hall: domestic consumer units need non-combustible enclosures.

Find it in the book

BS 7671:2018+A4:2026, page 93

Reg 421.1.201

Q2. An inspector samples 20 % of sub-main cables. What does GN3 say about the final circuit boards they supply?

Show answer

Answer: D. Do not sample them again; that is sampling samples

  • Do not 'sample samples', which gives a very low overall sampled installation.
  • If sub-main cables are sampled, further sampling should not be applied to the final circuit boards.

20 % of 20 % would be just 4 %.

Why the others are wrong:

A: applying sampling again gives a very low overall sample.

B: this is sampling samples, which GN3 warns against.

C: the boards still need inspecting.

Memory trick:

Never sample a sample.

Find it in the book

IET Guidance Note 3 (2022 edition), page 122

Reg GN3 Table 3.3 note 4

Q3. During a periodic inspection, which decision NOT to inspect is the hardest to justify?

Show answer

Answer: C. Skipping a look at cables in an accessible domestic loft

  • Dismantling and disconnection introduce a risk of unsatisfactory reassembly.
  • Where inspection would cause irreparable damage (e.g. lifting floor tiles), not inspecting is justified.
  • Where it is just extra work or inconvenience, such as a domestic loft void, not inspecting is hard to justify.

Why the others are wrong:

A: inspection would cause irreparable damage, so not inspecting is justified.

B: risk of damage can justify not dismantling.

D: disconnection risks poor reassembly, so it can be justified.

Memory trick:

Damage justifies, inconvenience doesn't.

Find it in the book

BS 7671:2018+A4:2026, page 254; IET Guidance Note 3 (2022 edition), page 111

Reg 651.2; GN3 3.3.1

Q4. A two-core cable is used as a switch line. How should the blue core be identified at its terminations?

Show answer

Answer: D. Overmarked with brown or L

  • For two-core switch wires, the blue conductor is overmarked brown or L at terminations.
  • In three-, four- or five-core cables, all non-brown line conductors used as switch lines and strappers are overmarked brown or L.

A switched line is still a line conductor.

Why the others are wrong:

A: GNYE is only for protective conductors.

B: blue alone suggests a neutral; it must be overmarked.

C: grey is L3, and brown or L is required here.

Memory trick:

Blue switch wire wears a brown sleeve.

Find it in the book

BS 7671:2018+A4:2026, page 141; IET Guidance Note 3 (2022 edition), page 49

Reg 514.3.2, GN3 2.5.3

Q5. In a ground-floor plant room that is not an escape route, cables are laid on steel cable tray with plastic ties. Is Regulation 521.10.202 (premature collapse in a fire) met?

Show answer

Answer: D. Yes, cables on steel containment are deemed to meet it

  • Wiring systems shall be supported so they are not liable to premature collapse in a fire.
  • This applies to all areas, not only designated escape routes.
  • Cables installed in or on steel containment are deemed to meet the requirement.

The steel tray carries them even if the ties melt.

Why the others are wrong:

A: plastic ties are a concern only where nothing else stops collapse.

B: BS 7671 deems cables on steel containment to comply.

C: the requirement applies to all areas, not just escape routes.

Memory trick:

On steel, it won't fall; that rule covers all.

Find it in the book

BS 7671:2018+A4:2026, page 149; IET Guidance Note 3 (2022 edition), page 29

Reg 521.10.202

Q6. Flexible stranded conductors at a screw terminal will be disconnected and reconnected often. What does GN3 recommend?

Show answer

Answer: C. Fit crimp ferrules to stop the strands spreading

  • Stranding class 2, 5 or 6 conductors that are frequently disconnected should be protected with crimp ferrules.
  • At stud terminals, use a suitable crimp such as a ring crimp.
  • Soldering only under the conditions of Regulation 526.9.
  • Some screwless terminals marked 'sol' are not suitable for ferrules.

Protect the strands and the connection stays sound.

Why the others are wrong:

A: soldering is only allowed under the conditions in 526.9.

B: doubling over is not the protection GN3 recommends.

D: twisting alone does not prevent spreading or damage.

Memory trick:

Fine strands, frequent changes: ferrule them.

Find it in the book

IET Guidance Note 3 (2022 edition), page 26

Reg GN3 2.5.2 a, Table 2.1