CITB Refrigeration and AC: Installing AC and refrigeration safely: electrics, lifting, hot work and height practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

40 of our 200 CITB HS&E Specialist Test: Refrigeration and Air Conditioning (CITB-SPEC-RAAC) questions are on installing ac and refrigeration safely: electrics, lifting, hot work and height, about 20% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. You move a mobile scaffold tower to a new position on the same site. Is a new inspection and report needed?

Show answer

Answer: A. No, not every time it moves on the same site

  • Where it is a mobile platform, a new inspection and report is not required every time it is moved to a new location on the same site.
  • It still needs inspection after assembly and at suitable intervals.

Users should still check it is complete and stable before use.

Why the others are wrong:

B: INDG401 says a new inspection and report is not required for each move.

C: distance moved is not the test given in the guidance.

D: mobile platforms still need inspection, just not after every move.

Memory trick:

Same site move: no new report.

Find it in the book

HSE INDG401(rev2) (2014), page 5

Reg HSE INDG401(rev2), Working at height

Q2. When planning the installation of a pressure receiver, what does L122 say about lifting it into place?

Show answer

Answer: B. Choose a lifting method that avoids damaging it

  • The employer of the installer should decide on the most suitable method of lifting and handling the vessels, protective devices and pipework, so as to avoid accidental damage.
  • They should also check for signs of damage in transit.

A dented or strained vessel may not be fit for pressure.

Why the others are wrong:

A: lifting by connections risks damage; a suitable method must be chosen.

C: the method must be chosen to avoid accidental damage.

D: the employer of the installer must decide the method.

Memory trick:

Lift it so you don't damage it.

Find it in the book

HSE L122 (2nd edition, 2014), page 26

Reg HSE L122 (2nd edition, 2014), para 79(d)

Q3. You will use a MEWP to reach a rooftop unit next to overhead power lines. What does INDG231 warn?

Show answer

Answer: C. Power can flash over without the MEWP touching

  • Electricity can flash over from overhead lines even though plant and equipment do not touch them.
  • It may be possible to have lines switched off with notice; otherwise consult the owners on safe distance.

Over half of fatal electrical accidents each year involve overhead lines.

Why the others are wrong:

A: electricity can flash over from overhead lines without contact.

B: the leaflet gives no such protection; flashover can still occur.

D: the leaflet warns about overhead lines generally.

Memory trick:

Near lines? It can jump the gap.

Find it in the book

HSE INDG231(rev1) (2012), page 5

Reg HSE INDG231(rev1), Electrical safety and you

Q4. You are in a MEWP basket and can't quite reach a fixing. What should you do?

Show answer

Answer: B. Lower it and reposition the MEWP

  • When using MEWPs, do not allow people to climb out of the carrier to reach their work position.
  • Do not operate MEWPs close to overhead cables.

Reposition the machine so the work is within easy reach.

Why the others are wrong:

A: people must not climb out of the carrier to reach their work.

C: climbing out of the carrier is not allowed.

D: overreaching from the basket risks falling or being thrown out.

Memory trick:

Stay in the basket, move the machine.

Find it in the book

HSE HSG150 (2006), page 34

Reg HSE HSG150, para 173

Q5. You notice the casing of a site extension reel is cracked and a wire is showing. What should happen to it?

Show answer

Answer: C. Take it out of use, label it and lock it away

  • Suspect or faulty equipment should be taken out of use, labelled 'DO NOT USE' and kept secure until examined by a competent person.
  • Damaged equipment should be repaired by someone competent or disposed of.

This stops the next person picking it up.

Why the others are wrong:

A: makeshift repairs leave a dangerous item in use.

B: faulty equipment must be taken out of use, whatever the load.

D: it must be labelled and kept secure so nobody else uses it.

Memory trick:

Faulty kit: out, labelled, locked away.

Find it in the book

HSE INDG231(rev1) (2012), page 4

Reg HSE INDG231(rev1), Electrical safety and you

Q6. What does INDG231 say should be provided near each fixed machine, such as a large condensing unit?

Show answer

Answer: D. An accessible, labelled emergency switch

  • Provide an accessible and clearly identified switch near each fixed machine to cut off power in an emergency.
  • For portable equipment, use socket outlets close by so it can be easily disconnected.

Anyone nearby should be able to find and use it quickly.

Why the others are wrong:

A: a spare fuse does not give a way to cut the power in an emergency.

B: a sign does not let anyone cut the power quickly.

C: a socket outlet is not an emergency means of isolation.

Memory trick:

Fixed machine, nearby kill switch.

Find it in the book

HSE INDG231(rev1) (2012), page 2

Reg HSE INDG231(rev1), Electrical safety and you

Want 194 more CITB Refrigeration and AC questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Refrigeration and AC topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic