CITB Refrigeration and AC: Core: high-risk activities practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 200 CITB HS&E Specialist Test: Refrigeration and Air Conditioning (CITB-SPEC-RAAC) questions are on core: high-risk activities, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Which way of securing a leaning ladder does HSG150 say is the last resort?

Show answer

Answer: D. Having someone foot the ladder

  • Options in order: tie the ladder (both stiles), use an effective stability device, or securely wedge the bottom.
  • Footing the ladder is the last resort and should be avoided by using other access equipment.

Almost half of ladder accidents happen because it was not prevented from slipping.

Why the others are wrong:

A: tying is the first option given.

B: a stability device is preferred over footing.

C: wedging is also listed before footing.

Memory trick:

Footing is the last resort.

Find it in the book

HSE HSG150 (2006), page 42

Reg HSE HSG150, para 222

Q2. A colleague enters a manhole to work on a pipe. What does L101 say must be arranged for raising the alarm?

Show answer

Answer: C. A reliable, tested way to signal people outside

  • There should be measures so those inside can communicate with people outside who can start rescue or summon help.
  • Methods include a tug on a rope, a radio or a lone worker alarm; the system should be reliable and tested frequently.

In some cases a dedicated rescuer outside must keep those inside in constant sight.

Why the others are wrong:

A: a sign cannot summon help or start a rescue.

B: occasional visits are not a reliable way for him to raise the alarm.

D: L101 warns CO2 extinguishers can displace oxygen, and an extinguisher is not an alarm.

Memory trick:

Inside needs a reliable line to the outside.

Find it in the book

HSE L101 (3rd edition, 2014), pages 35 to 36

Reg HSE L101 (3rd edition, 2014), para 154

Q3. A competent person inspecting an excavation is not satisfied it is safe. Within how long must they give a copy of the report to the person it was done for?

Show answer

Answer: B. Within 24 hours

  • Where the inspector is not satisfied work can be done safely, they must tell the person before the end of the shift and prepare a report.
  • A copy must be provided within 24 hours of completing the inspection; it is kept on site until the work is completed, then for 3 months.

No work may go on in the excavation until the problem is put right.

Why the others are wrong:

A: 7 days is the period in which only one report is needed, not the copy deadline.

C: 3 months is how long the report is kept after the work is completed.

D: the copy must be given within 24 hours.

Memory trick:

Report copy in 24 hours.

Find it in the book

HSE L153 (CDM 2015), page 53

Reg CDM 2015 regulation 24(1) and (3) (HSE L153)

Q4. When does HSG150 say a ladder may be used for work, if a risk assessment shows nothing better is justified?

Show answer

Answer: D. For light work of short duration, with a handhold

  • Ladders may be used for short-duration work (15 to 30 minutes in one position) and light work.
  • There must be a secure handhold available.

They are not suitable for strenuous tasks like supporting components.

Why the others are wrong:

A: footing does not make a ladder suitable for heavy or long tasks.

B: ladders are not suitable for carrying materials or heavy work.

C: ladders are for short duration work, typically 15 to 30 minutes in one position.

Memory trick:

Ladder: short, light, hand free.

Find it in the book

HSE HSG150 (2006), page 42

Reg HSE HSG150, para 220

Q5. You need to move a mobile tower scaffold to the next bay. What does HSG150 say?

Show answer

Answer: B. Lower it to 4 m and clear people and materials off

  • When moving a tower, reduce the height to a maximum of 4 m.
  • Never move it while there are people or materials on the tower; check for power lines and that the ground is firm and level.

Towers are easily made unstable.

Why the others are wrong:

A: never move a tower with people or materials on it.

C: the height should be reduced to a maximum of 4 m first.

D: check the route is clear and level before moving.

Memory trick:

Down to 4 m, nobody aboard.

Find it in the book

HSE HSG150 (2006), page 32

Reg HSE HSG150, para 164

Q6. Where should excavated spoil from your trench be placed?

Show answer

Answer: D. Away from the edges of the excavation

  • Do not park plant and vehicles or store spoil and materials close to the sides of excavations.
  • The extra load can make the sides more likely to collapse, and loose material can fall in.

Edge protection should include toeboards and head protection should be worn.

Why the others are wrong:

A: spoil near the edge adds load and can fall in.

B: loading the supports can cause collapse.

C: spoil should not create a hazard for others either.

Memory trick:

Spoil back from the edge.

Find it in the book

HSE HSG150 (2006), page 73

Reg HSE HSG150, para 350

Want 194 more CITB Refrigeration and AC questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Refrigeration and AC topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic