CITB Plumbing (JIB): Core: high-risk activities practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 200 CITB HS&E Specialist Test: Plumbing (JIB) (CITB-SPEC-PLUM) questions are on core: high-risk activities, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. You are digging a drain trench next to a garden wall. What risk does HSE warn about?

Show answer

Answer: C. The trench may undermine the wall's shallow foundations

  • Many garden or boundary walls have very shallow foundations that are easily undermined by even small trenches.
  • The wall can collapse onto those working in the trench; decide before digging if extra support is needed.

Excavations must not undermine scaffold footings or nearby buildings either.

Why the others are wrong:

A: services can still be present next to walls.

B: this is not the risk described.

D: a wall adds load and can collapse into the trench.

Memory trick:

Low wall, shallow footing: support it.

Find it in the book

HSE HSG150 (3rd edition, 2006), page 73

Reg HSE HSG150, paragraph 351

Q2. Where should spoil from a trench be placed?

Show answer

Answer: D. Back from the edge, so it doesn't overload the sides

  • Do not store spoil and materials close to the sides of excavations, as extra loading makes collapse more likely.
  • Loose material can also fall from spoil heaps onto people in the trench.

Edge protection should include toe boards to stop material falling in.

Why the others are wrong:

A: this would fill the working space and bury workers.

B: spoil at the edge can make the sides collapse.

C: spoil should not force people onto the road.

Memory trick:

Spoil back, sides stand.

Find it in the book

HSE HSG150 (3rd edition, 2006), page 73

Reg HSE HSG150, paragraph 350; CDM 2015, regulation 22(3)

Q3. You are digging near a pavement to repair a water pipe. What does HSE advise about underground cables?

Show answer

Answer: D. Assume they are there; use plans and a cable locator

  • Always assume cables will be present when digging in the street, pavement or near buildings.
  • Use up-to-date service plans, cable avoidance tools and safe digging practice.

Service plans are available from electricity companies and local authorities.

Why the others are wrong:

A: safe digging practice is needed near cables.

B: HSE says to always assume cables will be present.

C: cables can be found at any depth.

Memory trick:

Dig as if there's a cable.

Find it in the book

HSE INDG231 (rev1, 2012), page 4

Reg HSE INDG231, underground power cables

Q4. For asbestos work to count as 'short duration', what are the time limits?

Show answer

Answer: A. Under 2 hours in total per 7 days, 1 hour per person

  • Short duration means the total time for all workers does not exceed two hours in a seven-day period, including setting up and clearing up.
  • And no one person works for more than one hour in a seven-day period.

Short duration is one of the tests for whether work on insulation or AIB needs a licence.

Why the others are wrong:

B: the total is two hours, not eight.

C: the period is seven days.

D: the limits are set over a seven-day period.

Memory trick:

Two hours for the team, one for each person, per week.

Find it in the book

HSE L143 (2nd edition, 2013), page 16

Reg Control of Asbestos Regulations 2012 (HSE L143), ACOP paragraph 31

Q5. You are moving a mobile tower near an overhead power line. Why must you keep well clear even if nothing touches it?

Show answer

Answer: A. Electricity can flash over to it without contact

  • Electricity can flash over from overhead lines even though plant and equipment do not touch them.
  • Ask the owners to switch off the line, or agree a safe working distance with them.

Give the owners enough notice to arrange a switch-off.

Why the others are wrong:

B: you cannot assume lines are insulated.

C: any equipment near the line can be at risk.

D: lines can be live at any time.

Memory trick:

No touching needed to get a shock.

Find it in the book

HSE INDG231 (rev1, 2012), page 5

Reg HSE INDG231, overhead power lines

Q6. What is the asbestos control limit?

Show answer

Answer: A. 0.1 f/cm³, averaged over four hours

  • The control limit is 0.1 f/cm³ of airborne fibres averaged over a four-hour period.
  • Exposure above 0.6 f/cm³ over ten minutes is not sporadic and low intensity.

Work that could exceed the control limit is licensable.

Why the others are wrong:

B: this is not the control limit.

C: this is the test for sporadic and low intensity exposure.

D: this is not the control limit.

Memory trick:

Point one over four hours.

Find it in the book

HSE L143 (2nd edition, 2013), pages 15 to 16

Reg Control of Asbestos Regulations 2012 (HSE L143), ACOP paragraph 30

Want 194 more CITB Plumbing (JIB) questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Plumbing (JIB) topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic