Q1. Scaffold is being erected over a pavement and the footway has to be closed. What should be done for pedestrians?

Show answer

Answer: C. Barrier off the area and provide a safe alternative route

  • Sometimes the pavement must be closed to protect the public, eg during scaffold erection, demolition or façade cleaning.
  • The area may need barriering off with a safe alternative route for pedestrians; contact the Highways Authority for advice.

Think about people with prams, wheelchair users and the visually impaired.

Why the others are wrong:

A: scaffolds should never be erected over people or busy pavements.

B: pedestrians need a safe alternative route, not just a sign.

D: pushing people into traffic with no protected route is unsafe.

Memory trick:

Close the path, open a safe one.

Find it in the book

HSE HSG150 (3rd ed), page 108

Reg HSE HSG150, para 561

Q2. A gin wheel is going to be used to raise materials on a job next to a public footpath. What should be done?

Show answer

Answer: D. Use it in a safe place where members of the public are not at risk

  • When using gin wheels or power-driven hoists, select a safe place where members of the public are not at risk.
  • Protect passers-by from falling materials.

Loads can slip from a gin wheel rope without warning.

Why the others are wrong:

A: any falling load can injure someone.

B: members of the public should be kept away, not involved.

C: loads should not be lifted where the public are at risk.

Memory trick:

Hoist away from the public.

Find it in the book

HSE HSG150 (3rd ed), page 107

Reg HSE HSG150, para 557

Q3. When work is planned in a public area, whose needs does HSG150 say must be taken into account?

Show answer

Answer: A. Children, the elderly, disabled people and people with prams

  • Members of the public, including children, are killed and seriously injured each year by construction work.
  • Work in public areas must take account of children, people with prams, the elderly and those with disabilities.

Accidents often happen when people walk near buildings being worked on or near work in the street.

Why the others are wrong:

B: HSG150 names children and other vulnerable people specifically.

C: members of the public are also at risk from construction work.

D: pedestrians, especially vulnerable ones, must be considered too.

Memory trick:

Plan for the pram and the pensioner.

Find it in the book

HSE HSG150 (3rd ed), page 106

Reg HSE HSG150, paras 547 and 548

Q4. Where should flammable materials NOT be stored on site?

Show answer

Answer: C. Under staircases or near doors and fire exits

  • Designate storage areas for plant, materials, waste and flammable substances.
  • Do not store flammable materials under staircases or near doors or fire exits, and keep access routes clear.

Keep the amount of material on site to a minimum.

Why the others are wrong:

A: this is what HSG150 recommends.

B: this is a suitable place for flammables.

D: an outdoor store is a suitable option.

Memory trick:

Keep escape routes free of fuel.

Find it in the book

HSE HSG150 (3rd ed), pages 15 and 18

Reg HSE HSG150, paras 70 and 85

Q5. Before demolition starts, what should happen to gas, electricity and water services in the building?

Show answer

Answer: B. Isolated or disconnected, or clearly marked if that is not possible

  • Gas, electricity, water and telecoms should be isolated or disconnected before demolition.
  • Where this is not possible, pipes and cables should be clearly marked so they are not disturbed.

Asbestos must also be identified and removed first.

Why the others are wrong:

A: live services must be isolated or disconnected first.

C: all services, including gas and electricity, need dealing with.

D: this must be done before demolition starts.

Memory trick:

Kill the services before the building.

Find it in the book

HSE HSG150 (3rd ed), page 80

Reg HSE HSG150, para 395

Q6. The route of a buried service is being marked on a paved footway. What does HSG150 recommend?

Show answer

Answer: C. Biodegradable paint, or removing the marks soon after the work

  • Mark the route with paint on paved surfaces, using biodegradable paint or erasing marks soon after.
  • Use wooden pegs in grassed or unsurfaced areas.
  • Do not use steel spikes.

This reduces lasting marks on public surfaces.

Why the others are wrong:

A: steel spikes can damage services laid at shallow depth.

B: residual marks should be erased soon after excavation unless biodegradable.

D: the line of services should be recorded and marked.

Memory trick:

Paint that fades, pegs of wood.

Find it in the book

HSE HSG150 (3rd ed), page 75

Reg HSE HSG150, para 374

Want 294 more CITB HS&E Operatives questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB HS&E Operatives topics

Revise this topic