Q1. The Retrofit Coordinator cannot visit site in person. For which measure can they NOT rely on third-party digital evidence?
Show answer
Answer: B. External wall insulation
- 9.2: if an in-person visit is not possible, digital evidence from a third party is allowed only for listed measures (e.g. loft, cavity wall, boiler replacement, solar PV).
- Any EEM not listed, such as external wall insulation, needs an in-person inspection; so does a listed measure that penetrates another fabric EEM.
Complex fabric work needs eyes on site.
Why the others are wrong:
A: party cavity wall insulation is on the list allowing digital evidence.
C: boiler replacement is on the list allowing digital evidence.
D: loft insulation is on the list allowing digital evidence.
Memory trick:
EWI needs boots on the ground.