30 of our 60 Unvented Hot Water Storage Systems (G3) (G3-UNVENTED) questions are on discharge pipework, about 50% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. A G1/2 T&P valve on an unvented cylinder needs a D2 run of 6.5m from the tundish to a gully, with 6 elbows. Using Table 3.1 (22mm: 9m allowance, 0.8m per elbow; 28mm: 18m allowance, 1.0m per elbow), what is the smallest copper D2 size that complies?

Show answer

Answer: A. 28mm

  • 22mm: 9 - (6 x 0.8) = 4.2m, less than 6.5m, so it fails.
  • 28mm: 18 - (6 x 1.0) = 12.0m, more than 6.5m, so it passes.

Try the smallest D2 first, then step up one size at a time until the permitted length covers the actual run.

Why the others are wrong:

B: 22mm allows only 9 - 4.8 = 4.2m of pipe, which is less than the 6.5m run.

C: 35mm would work but is not the smallest; 28mm already allows 12m.

D: 15mm is the minimum D1 size for a G1/2 valve, not a D2 size.

The maths

Step 1: 22mm D2: 9.0 - (6 x 0.8) = 9.0 - 4.8 = 4.2m permitted. Actual 6.5m > 4.2m, so 22mm fails.
Step 2: 28mm D2: 18.0 - (6 x 1.0) = 18.0 - 6.0 = 12.0m permitted. Actual 6.5m < 12.0m, so 28mm is satisfactory.
Step 3: Smallest compliant size = 28mm.

Memory trick:

Fail at one size? Step up one and recalculate with the new bend figure.

Reg Approved Document G, Table 3.1, 3.58

Q2. A G1 relief valve discharges into a 35mm copper D2 with 3 bends. For 35mm from a G1 valve, Table 3.1 gives 9m maximum resistance and 1.4m per bend. What is the maximum actual length of D2?

Show answer

Answer: C. 4.8m

  • Allowance: 9m.
  • Bends: 3 x 1.4m = 4.2m.
  • Permitted pipe: 9.0 - 4.2 = 4.8m.

With large valves and several bends the real length allowed shrinks quickly, which is why bends should be kept to a minimum.

Why the others are wrong:

A: 1.7m per bend belongs to 42mm pipe, not 35mm.

B: 1.0m per bend is a smaller pipe's figure; 35mm bends on this row are 1.4m each.

D: this ignores the three bends entirely.

The maths

Step 1: Table 3.1, G1 valve, 35mm D2: 9.0m allowance.
Step 2: 3 bends x 1.4m = 4.2m.
Step 3: 9.0 - 4.2 = 4.8m maximum actual length.

Memory trick:

Count the bends first: each one eats into the 9m.

Reg Approved Document G, Table 3.1

Q3. Without using Table 3.1, a designer works out that a D2 run has a total equivalent hydraulic resistance of 20m of straight pipe. By the general rule in AD G, D2 must be at least how many sizes larger than the safety device's nominal outlet?

Show answer

Answer: C. Three sizes larger

  • Up to 9m: at least one size larger.
  • 9m to 18m: at least two sizes larger.
  • 18m to 27m: at least three sizes larger.

20m falls in the 18 to 27m band, so D2 must be at least three sizes up.

Why the others are wrong:

A: two sizes larger covers 9m to 18m; 20m is beyond that.

B: one size larger only covers equivalent lengths up to 9m.

D: four sizes would be needed only beyond 27m.

The maths

Step 1: Bands are every 9m: 0-9 (1 size), 9-18 (2 sizes), 18-27 (3 sizes).
Step 2: 20m lies between 18m and 27m.
Step 3: D2 at least 3 sizes larger than the nominal outlet.

Memory trick:

Every 9m of resistance costs one more pipe size.

Reg Approved Document G, 3.58

Q4. Which is NOT a requirement when D2 discharges into a suitable soil stack?

Show answer

Answer: B. The branch must be at least 54mm diameter

  • Required: separate branch with no sanitary appliances, continuous warning marking, mechanical seal without a water trap, suitable materials.
  • No fixed 54mm size is set by AD G.

The marking prevents someone later connecting a basin or WC.

Why the others are wrong:

A: this is a requirement; the branch must be separate.

C: this is required, warning that no appliances be connected.

D: this is required to stop foul air coming out of the tundish.

Memory trick:

Separate, sealed, signed.

Reg Approved Document G, 3.60(b), 3.60(d)

Q5. A 42mm D2 from a G1 relief valve has 9m of pipe and 3 bends. Table 3.1 gives 42mm on the G1 row an 18m allowance and 1.7m per bend. How much allowance is left for future extension?

Show answer

Answer: D. 3.9m

  • Equivalent length: 9 + (3 x 1.7) = 14.1m.
  • Spare: 18 - 14.1 = 3.9m.

Any extension, including extra bends, must fit inside that remaining 3.9m.

Why the others are wrong:

A: 27m is the 54mm allowance, not the 42mm one.

B: this ignores the 5.1m taken up by the three bends.

C: 1.4m per bend is the 35mm figure; 42mm bends here are 1.7m each.

The maths

Step 1: Bends: 3 x 1.7 = 5.1m.
Step 2: Equivalent length = 9.0 + 5.1 = 14.1m.
Step 3: Spare = 18.0 - 14.1 = 3.9m.

Memory trick:

Spare = allowance minus (pipe plus bends).

Reg Approved Document G, Table 3.1

Q6. An installer wants to size a D2 run in plastic pipe. What does AD G say about using Table 3.1?

Show answer

Answer: B. It is for copper; use the plastic pipe's own data

  • Table 3.1 is based on copper tube.
  • Plastic may have a different bore and resistance.
  • Size it using data for the type of plastic pipe.

Why the others are wrong:

A: no such adjustment is given; plastic needs its own data.

C: plastic bore and resistance may differ, so the copper table cannot be adapted like this.

D: the table note says it is based on copper tube only.

Memory trick:

Copper table for copper pipe.

Reg Approved Document G, Table 3.1 Note

Want 54 more G3 Unvented questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other G3 Unvented topics

Revise this topic