ECS HS&E: Work Equipment practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

32 of our 400 ECS Health, Safety and Environmental Assessment (ECS-HSE) questions are on work equipment, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Which items should be clearly marked with their safe working load?

Show answer

Answer: D. Lifting machinery and lifting accessories

  • Machinery and accessories for lifting loads should be clearly marked to show their safe working loads.

Never exceed the marked SWL.

Why the others are wrong:

A: SWL marking applies to equipment for lifting loads.

B: these carry electrical ratings, not safe working loads.

C: SWL marking is for lifting machinery and accessories.

Memory trick:

If it lifts, it shows its SWL.

Reg Lifting equipment

Q2. Why is a lower voltage needed for hand lamps in damp or cramped conductive locations?

Show answer

Answer: B. Any electric shock would be more severe there

  • Where the environment is damp, or restricting and conductive, the magnitude of any electric shock will be higher than normal.
  • Hand lamps there should be on SELV, max 50 V, separated from earth.

Why the others are wrong:

A: the reason is shock risk, not overheating.

C: the reason is the severity of a shock.

D: brightness is not the reason.

Memory trick:

Wet and tight makes shocks bite.

Reg Site electrical supplies

Q3. An electric drill keeps cutting out while you are using it. What should you do?

Show answer

Answer: B. Remove it from use and tell your supervisor

  • A drill that cuts out may be faulty.
  • Tell your supervisor and remove it from service.

Why the others are wrong:

A: the drill may be faulty and should be taken out of use.

C: a possibly faulty drill should be removed from service.

D: the drill may be faulty; report it.

Memory trick:

Cuts out? Take it out.

Reg Work equipment

Q4. You need to change the bit on a cordless SDS drill. What is the cordless equivalent of disconnecting it from the power source?

Show answer

Answer: C. Taking the battery out

  • Before adjusting a tool, disconnect it from the power source.
  • Do not adjust a tool that could still be live or operate.

For a cordless tool, the battery is the power source, so remove it.

Why the others are wrong:

A: a slow drill can still start and cause injury.

B: this would keep it able to run, the opposite of what is needed.

D: the drill could still run if the trigger is pressed.

Memory trick:

No battery, no surprise spin.

Reg Work equipment (adjusting tools)

Q5. A new labourer offers to move a site dumper because he 'has driven one before'. Who should operate plant on site?

Show answer

Answer: A. Only people trained and authorised to do so

  • Never operate plant or equipment unless you have been trained and are authorised to do so.

Why the others are wrong:

B: only trained and authorised people may operate plant.

C: watching is not training or authorisation.

D: only trained and authorised people may operate plant.

Memory trick:

Trained AND authorised, or hands off.

Reg Work equipment

Q6. You need one hand lamp for general site use and another inside a damp, cramped metal tank. Which supply arrangement is recommended?

Show answer

Answer: A. 110 V for general use, SELV max 50 V in the tank

  • Portable hand lamps for general use: 110 V preferred.
  • In damp or confined conductive locations: SELV, maximum 50 V, separated from earth.

Any shock would be more severe in those locations.

Why the others are wrong:

B: 230 V is not preferred for either use.

C: in damp, conductive locations SELV at 50 V maximum is recommended.

D: this is the wrong way round.

Memory trick:

Tight and wet? 50 is the limit you get.

Reg Site electrical supplies

Want 394 more ECS HS&E questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other ECS HS&E topics

Revise this topic