Domestic Ventilation: Installation, testing and commissioning practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

27 of our 90 Domestic Ventilation Systems (DOM-VENT) questions are on installation, testing and commissioning, about 30% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. What is the minimum free area of an external air terminal compared with its associated duct?

Show answer

Answer: A. 90% of the duct's free area

  • Each external air terminal should have a free area of at least 90% of its duct's free area.
  • This keeps resistance at the outlet low.

A restrictive grille can undo the benefit of a well-sized duct.

Why the others are wrong:

B: 50% would choke the flow; the stated minimum is much higher.

C: 75% is below the stated minimum.

D: 80% is below the stated minimum.

Memory trick:

Terminal grille: at least nine tenths.

Find it in the book

Approved Document F Vol 1 2021, page 17; 2026 edition, page 18

Reg Approved Document F Vol 1, 2021 para 1.80; 2026 edition para 1.84

Q2. What should be provided for a new dwelling in addition to the operating and maintenance instructions?

Show answer

Answer: B. A Home User Guide with a non-technical section on ventilation

  • A Home User Guide for a new dwelling follows Section 9 of Approved Document L, Volume 1.
  • It should include a 'Ventilation' section with non-technical advice.

The O&M instructions give the fuller detail.

Why the others are wrong:

A: the requirement is a Home User Guide with a ventilation section.

C: technical design calculations are not the Home User Guide.

D: new dwellings need a Home User Guide as well.

Memory trick:

New home? Hand over the user guide too.

Find it in the book

Approved Document F Vol 1 2021, page 35; 2026 edition, page 38

Reg Approved Document F Vol 1, 2021 para 4.18; 2026 edition para 4.34

Q3. Where flexible ductwork is used on a domestic ventilation installation, what should it be limited to?

Show answer

Answer: D. Final connections only

  • Rigid ducting is the default, and flexible duct is for final connections only.
  • The maximum length differs by edition: 1.5m in the 2021 edition, 200mm to fan spigots in the 2026 edition.

Flexible duct should keep its full internal diameter so flow resistance stays low.

Why the others are wrong:

A: location does not make flexible duct acceptable; it is for final connections only.

B: bends should be kept to a minimum in rigid duct; flexible duct is for final connections only.

C: flexible duct is limited to final connections in both editions, however taut it is pulled.

Memory trick:

Flexi is for the final hop only.

Find it in the book

Approved Document F Vol 1 2021, page 17; 2026 edition, page 17

Reg Approved Document F Vol 1, 2021 para 1.77; 2026 edition para 1.79

Q4. Mechanical ventilation air flow testing has been completed on a new house. By when must the results be given to the building control body?

Show answer

Answer: A. Within five days after the final test

  • Regulation 42 requires air flow test results for a new dwelling to reach building control no later than five days after the final test.
  • Results are recorded in the approved format, using the Appendix C sheets.

This regulation applies when a new dwelling is created by building work.

Why the others are wrong:

B: 30 days is the latest time for the regulation 44 commissioning notice, not the air flow test results.

C: 10 days is not the stated period; the limit is shorter.

D: results cannot be sent before the tests; notice follows the final test.

Memory trick:

Test done? Five days to send.

Find it in the book

Approved Document F Vol 1 2021, page 29; 2026 edition, pages 29 and 37

Reg Approved Document F Vol 1, 2021 Reg 42(3); 2026 edition Reg 42(3), para 4.25

Q5. After installing an extract system, the installer makes a visual inspection. Which two things should it confirm?

Show answer

Answer: B. There are no obvious defects and all packaging has been removed

  • The visual inspection confirms no obvious defects and that all packaging has been removed.
  • Commissioning to an approved procedure follows, recorded on the Appendix C sheets.

Packaging left on a vent or grille can block the air path.

Why the others are wrong:

A: AD F sets no such check.

C: these are not the stated inspection points.

D: air flow testing is a separate commissioning step, not the visual inspection.

Memory trick:

Look for faults, strip the wrapping.

Find it in the book

Approved Document F Vol 1 2021, page 18; 2026 edition, page 18

Reg Approved Document F Vol 1, 2021 para 1.82; 2026 edition para 1.86

Q6. Who completes Part 2b (inspection of installation) of the Appendix C checklist, and when?

Show answer

Answer: D. The commissioning engineer, before completing Part 3

  • Part 2a is completed by the installer before commissioning.
  • Part 2b is completed by the commissioning engineer before Part 3 (air flow results).

Part 2b is a visual pre-commissioning check.

Why the others are wrong:

A: the commissioning engineer completes Part 2b, and before Part 3.

B: Part 2b is a pre-commissioning check by the commissioning engineer.

C: the homeowner does not complete the checklist.

Memory trick:

2a installer, 2b commissioner, then 3.

Find it in the book

Approved Document F Vol 1 2021, page 45; 2026 edition, page 49

Reg Approved Document F Vol 1, 2021 and 2026 editions, Appendix C, Part 2b

Want 84 more Domestic Ventilation questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other Domestic Ventilation topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (GOV.UK). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic