Q1. Why must plant keep well clear of overhead power lines even if it does not touch them?

Show answer

Answer: B. Electricity can flash over across the gap

  • Electricity can flash over from overhead lines even though plant and equipment do not touch them.
  • Over half of fatal electrical accidents each year involve contact with overhead lines.

Ask the owner if the line can be switched off with enough notice.

Why the others are wrong:

A: radiation is not the hazard described.

C: engine stalling is not the hazard described.

D: wires do not create wind that tips plant.

Memory trick:

No touch needed to get hurt.

Find it in the book

HSE INDG231(rev1) Electrical safety and you: A brief guide (2012), pages 4 to 5

Reg HSE INDG231(rev1), Overhead power lines

Q2. HSG33 says that if you can keep a certain distance from overhead lines, measured horizontally at ground level from below the nearest wire, you are likely to need no extra precautions beyond controlling access. What are those distances?

Show answer

Answer: B. 15 m from steel towers and 9 m from wooden poles

  • Keeping at least 15 m from steel towers and 9 m from wooden poles usually means no extra precautions apart from controlling access.
  • Always follow any precautions identified by the DNO.

Closer working needs a proper risk assessment and agreed controls.

Why the others are wrong:

A: the figures are the wrong way round; towers need the greater distance.

C: these are close to exclusion zone figures, not the no-extra-precautions distances.

D: these distances are much greater than the figures given.

Memory trick:

Fifteen for steel, nine for wood.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 22

Reg HSE HSG33, para 80

Q3. Construction work is planned beneath overhead electric power cables. Under CDM 2015, what must happen first?

Show answer

Answer: B. Divert the cables away, or have the power isolated

  • Where overhead cables create a risk, they must be directed away from the area of risk, or the power isolated and earthed where necessary.
  • If that is not reasonably practicable, provide warning notices plus barriers, suspended protections or equivalent measures.

Only the line owner (DNO) can relocate or switch off a line.

Why the others are wrong:

A: notices are only part of the fallback if diverting or isolating is not reasonably practicable.

C: a ladder material change does not meet the regulation.

D: a lookout does not prevent contact with the cables.

Memory trick:

Move it or kill it, then barrier.

Find it in the book

HSE L153 Managing health and safety in construction (CDM 2015), page 54

Reg HSE L153, regulation 25(2) to (3)

Q4. Taking individual asbestos cement roof sheets down intact by hand is generally treated as what?

Show answer

Answer: D. Non-licensed work that is not usually notifiable

  • Demolition involving asbestos cement sheets is not licensed work if control limits are not exceeded, but may be notifiable.
  • In general, removing sheets intact by hand is not notifiable; remote demolition that breaks sheets is notifiable as NNLW.

The employer must decide before starting whether the work is notifiable.

Why the others are wrong:

A: asbestos cement sheet demolition is not licensed work within the control limits.

B: remote demolition with deliberate breakage is notifiable; intact hand removal generally is not.

C: it is still work with asbestos and must follow L143.

Memory trick:

Whole by hand: usually not NNLW. Smashed by machine: NNLW.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 85

Reg HSE HSG33, Appendix 5, paras 3 and 7

Q5. A bitumen boiler is set up at ground level beside a school being refurbished. What protection does HSG33 require?

Show answer

Answer: C. Physical barriers and a responsible person always present

  • A ground-level bitumen or hot-melt boiler needs a suitable exclusion zone so the public cannot get to it.
  • Physical barriers are needed, not bunting or painted lines, and a responsible person must be in attendance at all times.

This is especially important at schools and similar public buildings.

Why the others are wrong:

A: bunting is not enough; physical barriers are needed.

B: painted lines are not enough; physical barriers are needed.

D: ground-level boilers need an exclusion zone the public cannot enter.

Memory trick:

Hot boiler near kids: hard barrier, someone watching.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 51

Reg HSE HSG33, para 238

Q6. How should hot bitumen be taken out of a boiler?

Show answer

Answer: A. Through the boiler's draw-off tap

  • Never use a ladle to remove bitumen; use the draw-off tap.
  • Carry bitumen in lidded buckets and set them down on non-combustible surfaces.

Wear eye protection, gloves, suitable footwear and clothing.

Why the others are wrong:

B: a ladle must never be used.

C: tipping a boiler of hot bitumen risks serious burns.

D: scooping with the lid open risks splashes and fire.

Memory trick:

Tap it, don't ladle it.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 90

Reg HSE HSG33, Appendix 6, para 7

Want 194 more CITB Work at Height questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Work at Height topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic