CITB Work at Height: Core: environment practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 200 CITB HS&E Specialist Test: Work at Height (CITB-SPEC-WAH) questions are on core: environment, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. You need to cut paving slabs beside a busy shopping street. Which choice best cuts dust and noise nuisance to the public?

Show answer

Answer: C. Use a slab guillotine instead of a disc cutter

  • Adopt different work methods, for example guillotines rather than disc cutters for paving slabs.
  • Other options include water suppression, low-dust products and working when the public are less likely to be about.

Controls that protect the workforce often reduce nuisance to others too.

Why the others are wrong:

A: dry cutting creates more dust; water suppression or another method is needed.

B: working when more people are about increases their exposure.

D: a bigger disc cutter still makes dust and noise.

Memory trick:

Chop, don't grind, near the public.

Find it in the book

HSE HSG151 Protecting the public: Your next move (2nd edition, 2009), page 22

Reg HSE HSG151, para 76

Q2. During remote demolition of an asbestos cement roof, how should the broken sheet be gathered up?

Show answer

Answer: D. By hand where possible, keeping the material wet

  • Pick broken asbestos cement by hand where possible, and keep the material wet with gentle spraying.
  • Do not bulldoze it into a pile and do not use toothed buckets; take care not to drive plant over it.

Carry out and finish this work before demolishing the rest of the structure.

Why the others are wrong:

A: bulldozing it into a pile is specifically warned against.

B: toothed buckets must not be used.

C: dry handling raises fibres; keep it wet.

Memory trick:

Wet it, pick it, don't crush it.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 87

Reg HSE HSG33, Appendix 5, para 17

Q3. Why should the skip at the bottom of a debris chute be covered during roof stripping next to a street?

Show answer

Answer: B. To protect the public from dust and flying debris

  • Lower waste in purpose-made skips or baskets, or use enclosed debris chutes.
  • Cover skips where necessary to protect the public from dust and flying materials, and close off chutes when the skip is removed.

Never throw waste from a roof or scaffold.

Why the others are wrong:

A: keeping rain out is not the safety reason given.

C: appearance is not the reason; protecting people is.

D: cost is not the reason given in the guidance.

Memory trick:

Chute it down, cover it up.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 51

Reg HSE HSG33, para 236

Q4. How should old slates be removed from a roof during stripping?

Show answer

Answer: C. Lowered in skips or baskets, or sent down a chute

  • Never throw waste materials such as old slates or tiles from the roof or scaffold ('bombing').
  • Lower waste in skips or baskets designed for the purpose, or use enclosed debris chutes.

Close off chutes when the skip below has been taken away.

Why the others are wrong:

A: throwing waste from a roof ('bombing') must never be done.

B: dropping waste onto a pavement endangers the public.

D: sliding material off the roof is uncontrolled and dangerous.

Memory trick:

Lower it, don't throw it.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 51

Reg HSE HSG33, para 236

Q5. A contractor plans remote demolition of an asbestos cement roofed shed close to houses. Which step does HSG33 advise to deal with public concern?

Show answer

Answer: B. Consult the local environmental health department

  • To ease concerns, keep neighbours informed, consult the local environmental health department and carry out regular airborne monitoring downwind.
  • Remote demolition can appear noisy, dusty and uncontrolled to the public.

Demolition by hand is the preferred option where it can be done safely.

Why the others are wrong:

A: hiding the work does not address concern; the guidance advises openness.

C: sheets should be kept wet to reduce fibre release.

D: neighbours should be kept informed during the work, not afterwards.

Memory trick:

Tell them, ask EH, monitor downwind.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 88

Reg HSE HSG33, Appendix 5, para 23

Q6. At the end of each shift removing asbestos cement sheets, what happens to the workers' disposable overalls and masks?

Show answer

Answer: D. They are disposed of as hazardous waste

  • Provide workers with disposable overalls.
  • These should be safely disposed of with the masks as hazardous waste at the end of every shift.

RPE must be suitable, such as FFP3, and wearers face-fit tested.

Why the others are wrong:

A: taking contaminated overalls home spreads asbestos.

B: they are hazardous waste and cannot go in general waste.

C: keeping them for reuse spreads contamination.

Memory trick:

Asbestos overalls: one shift, then hazardous waste.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 87

Reg HSE HSG33, Appendix 5, para 18

Want 194 more CITB Work at Height questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Work at Height topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic