CITB Work at Height: Core: general safety practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 200 CITB HS&E Specialist Test: Work at Height (CITB-SPEC-WAH) questions are on core: general safety, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Torch-on roofing has just finished for the day. How long should the hot work area be continuously watched for fire?

Show answer

Answer: A. At least an hour, with a further check two hours after

  • Keep a continuous fire watch for at least an hour after hot work ends.
  • Then carry out at least one more check two hours after the end of hot work.

Fire watches also apply when workers take breaks during the day.

Why the others are wrong:

B: 15 minutes is far too short; smouldering fires can take time to show.

C: cylinder temperature has nothing to do with how long to watch for fire.

D: the guidance asks for a longer watch and a follow-up check.

Memory trick:

One hour watching, two hours checking.

Find it in the book

HSE HSG168 Fire safety in construction (3rd edition, 2022), page 16

Reg HSE HSG168, Part 1, box after para 51 (sources of ignition)

Q2. Materials must be stored inside an enclosed building under construction. What minimum fire resistance should a separating partition give?

Show answer

Answer: B. 30 minutes

  • If storage outside is not possible, arrange internal stores to limit the spread of fire.
  • In more enclosed buildings you may need a partition giving at least 30 minutes' fire resistance, with fire-resisting, self-closing doors.

Good-quality plasterboard partitions with skimmed joints can usually achieve this.

Why the others are wrong:

A: 10 minutes is below the figure given.

C: 2 hours is not the figure given.

D: 4 hours is not the figure given.

Memory trick:

Internal store: half an hour's protection.

Find it in the book

HSE HSG168 Fire safety in construction (3rd edition, 2022), page 37

Reg HSE HSG168, para 210

Q3. A 110 V extension lead must be joined to another length of cable. How should this be done?

Show answer

Answer: D. Use a proper connector or cable coupler

  • Use proper connectors or cable couplers to join lengths of cable.
  • Do not use strip connector blocks covered in insulating tape, and replace damaged sections completely.

The outer sheath should be clamped firmly at each end.

Why the others are wrong:

A: twisted and taped joints are unsafe.

B: strip connector blocks covered in tape must not be used.

C: knotting does not make a safe electrical joint.

Memory trick:

Couple it, don't tape it.

Find it in the book

HSE INDG231(rev1) Electrical safety and you: A brief guide (2012), page 2

Reg HSE INDG231(rev1), Provide safe and suitable equipment

Q4. Why does HSE roof guidance warn about tool cables on profiled metal sheet roofs?

Show answer

Answer: C. Sheet edges can damage the cable insulation

  • Portable electrical tools create hazards on roofs, for example metal roof sheet edges can damage cable insulation.
  • Where possible use battery-operated tools, otherwise a 110 V centre-tapped to earth supply.

Supplies should come from properly installed industrial-type plugs and sockets.

Why the others are wrong:

A: lightning is not the hazard described; mechanical damage to cables is.

B: cables have no effect on sheet strength.

D: voltage drop is not the risk; damaged insulation can expose live conductors.

Memory trick:

Sharp sheets, cut cables.

Find it in the book

HSE HSG33 Health and safety in roof work (5th edition, 2020), page 22

Reg HSE HSG33, para 82

Q5. A rubbish skip has to stand less than 3 m from the building. Which precaution does HSE fire guidance give?

Show answer

Answer: D. Place it against a fire-resisting wall such as brick

  • If a skip is less than 3 m from other structures, take precautions to stop a skip fire spreading.
  • Site it against a fire-resisting wall with no unprotected openings, and avoid canopies or overhanging eaves.

Skips are a common target for arson.

Why the others are wrong:

A: skips should not go beneath overhanging eaves.

B: skips should not go beneath canopies.

C: leaving it open is not the precaution given against fire spread.

Memory trick:

Close skip? Brick wall, open sky.

Find it in the book

HSE HSG168 Fire safety in construction (3rd edition, 2022), page 37

Reg HSE HSG168, para 214

Q6. Where should rags soaked in solvent or adhesive be kept on site?

Show answer

Answer: A. In a closed-top metal bin

  • Keep flammable rubbish, such as contaminated rags, in a closed-top, fire-resisting container, such as a metal dustbin.
  • Set site rules so contractors clear rubbish daily or more often.

Construction sites, especially during fit-out, generate lots of easily ignited waste.

Why the others are wrong:

B: an open sack lets vapour escape and fire spread.

C: storing them with tools in a van is not a fire-resisting container.

D: storing under stairs can block escape routes if they catch fire.

Memory trick:

Oily rags: metal bin, lid on.

Find it in the book

HSE HSG168 Fire safety in construction (3rd edition, 2022), page 37

Reg HSE HSG168, para 213

Want 194 more CITB Work at Height questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Work at Height topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic