Q1. When must welfare facilities be available on a construction project?

Show answer

Answer: D. Before any construction work starts

  • Welfare facilities must be made available before any construction work starts.
  • They should be maintained until the end of the project.

What is suitable depends on the size and nature of the workforce.

Why the others are wrong:

A: facilities must be in place before work starts, not after.

B: welfare is needed whatever the number of workers.

C: welfare duties apply to all projects, notifiable or not.

Memory trick:

No welfare, no start.

Find it in the book

HSE L153 (CDM 2015), page 41

Reg CDM 2015, regulation 13(4)(c) and L153 para 137

Q2. What must rest facilities on a construction site include?

Show answer

Answer: D. A way to boil water and to prepare and eat meals

  • Rest areas need tables and seating with backs, arrangements so meals can be prepared and eaten, and the means for boiling water.
  • They must be kept at an appropriate temperature.

Where needed, a pregnant worker or nursing mother must be able to rest lying down.

Why the others are wrong:

A: entertainment is not a Schedule 2 requirement.

B: rest areas can be shared; separate rooms per firm are not required.

C: Schedule 2 sets no such ratio; it needs a means of boiling water and meal arrangements.

Memory trick:

Kettle, table, chair with a back.

Find it in the book

HSE L153 (CDM 2015), pages 64 to 65

Reg CDM 2015, Schedule 2, para 5(2) (HSE L153)

Q3. What does 'so far as reasonably practicable' mean in HSE guidance?

Show answer

Answer: C. Weighing risk against cost, time and trouble

  • It means balancing the level of risk against the measures needed in terms of money, time or trouble.
  • You do not need to act if it would be grossly disproportionate to the risk.

The bigger the risk, the more effort is reasonable to control it.

Why the others are wrong:

A: the test is a balance of risk against the measures needed.

B: action is not needed where it would be grossly disproportionate to the risk.

D: the client's budget does not set the legal standard.

Memory trick:

Big risk, big effort; tiny risk, small effort.

Find it in the book

HSE HSG65 (3rd edition, 2013), page 25

Reg HSG65, 'What does so far as reasonably practicable mean?'

Q4. When working out how long a project's construction work will last for notification, which days count?

Show answer

Answer: D. Every day work is likely, including weekends

  • Every day construction work is likely to take place counts, including weekends and bank holidays.
  • If scope changes make a project notifiable later, the client must notify as soon as possible.

This stops long weekend working being left out of the count.

Why the others are wrong:

A: the count is of days construction work takes place, whoever is there.

B: the guidance says weekends and bank holidays count if work is likely on them.

C: worker numbers are a separate test; every working day counts towards duration.

Memory trick:

Saturday shifts still count.

Find it in the book

HSE L153 (CDM 2015), page 20

Reg CDM 2015, regulation 6 and L153 para 47

Q5. What does CDM 2015 require of an emergency route or exit on site?

Show answer

Answer: C. It leads as directly as possible to a safe area

  • An emergency route must lead as directly as possible to an identified safe area.
  • It must be kept clear, have emergency lighting where needed, and be indicated by suitable signs.

Routes change as the build progresses, so check them often.

Why the others are wrong:

A: each route must be indicated by suitable signs throughout.

B: no width is set in regulation 31; it must lead directly to a safe area.

D: routes and exits must be kept clear and free from obstruction.

Memory trick:

Direct, clear, lit, signed.

Find it in the book

HSE L153 (CDM 2015), page 56

Reg CDM 2015, regulation 31(3) and (5) (HSE L153)

Q6. Under CDM 2015 Schedule 2, where must washing facilities be provided?

Show answer

Answer: C. Near every toilet, even if provided elsewhere

  • Washing facilities must be in the immediate vicinity of every sanitary convenience.
  • They are also needed near any changing rooms, whether or not provided elsewhere.

Workers must be able to wash straight after using the toilet.

Why the others are wrong:

A: Schedule 2 requires them in the immediate vicinity of every sanitary convenience.

B: washing facilities are required for everyone, not just some trades.

D: no distance is given; they must be next to toilets and changing rooms.

Memory trick:

Toilet first, tap right next to it.

Find it in the book

HSE L153 (CDM 2015), page 63

Reg CDM 2015, Schedule 2, para 2(2) (HSE L153)

Want 194 more CITB Supervisory questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Supervisory topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic