CITB Highway Works: Traffic, plant and protecting the public practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

40 of our 200 CITB HS&E Specialist Test: Highway Works (CITB-SPEC-HIW) questions are on traffic, plant and protecting the public, about 20% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Within what distance of tramway overhead lines must work not begin until the operator certifies they are disconnected?

Show answer

Answer: A. 3 m

  • Work must not begin within 3 m of overhead lines until the tramway operator certifies the electricity is disconnected and safe.
  • No plant, vehicles or equipment within 3 m unless the operator permits it.

Power is not reconnected until your organisation certifies the site is clear.

Why the others are wrong:

B: the Code gives 3 m.

C: the Code gives 3 m.

D: the Code gives 3 m.

Memory trick:

Tram wires: three metres clear.

Find it in the book

DfT Safety at street works and road works (2013), page 77

Reg Safety at street works CoP (2013), Risk of electrocution (tramways)

Q2. Works are planned within the precautionary area of a level crossing. When must Network Rail be advised?

Show answer

Answer: A. At least one month before the initial notice

  • The precautionary area is any road within 200 m of the centre of the crossing.
  • Works there must be advised to Network Rail's Asset Protection Engineer at least one month before serving the initial notice.

Traffic must never be allowed to queue back across a level crossing.

Why the others are wrong:

B: the Code requires at least one month.

C: this is far too short.

D: any works in the precautionary area must be advised.

Memory trick:

Two hundred metres, one month's notice.

Find it in the book

DfT Safety at street works and road works (2013), page 78

Reg Safety at street works CoP (2013), Works at or near railway level crossings

Q3. Portable traffic signals are running at your site. What must also be kept on site?

Show answer

Answer: B. Stop/Go boards in case the signals fail

  • You must have Stop/Go boards available on site in case the portable signals break down.
  • An emergency contact number for the signal provider should be displayed.

Multi-phase signals should only be installed and adjusted by competent operatives.

Why the others are wrong:

A: police attendance is not required.

C: the Code does not require this.

D: the back-up named in the Code is Stop/Go boards.

Memory trick:

Lights fail? Boards ready.

Find it in the book

DfT Safety at street works and road works (2013), page 67

Reg Safety at street works CoP (2013), Installation and commissioning

Q4. A site dumper is being loaded by an excavator. Where should the dumper driver be?

Show answer

Answer: B. Off the dumper, standing in a safe place

  • HSG144's dumper checklist says get off the dumper when it is being loaded.
  • Load on flat ground with brakes applied, and never carry passengers without a proper seat.

Dumpers are involved in many fatal and major accidents on site.

Why the others are wrong:

A: the driver should get off while it is loaded.

C: nobody should be in the skip during loading.

D: the driver should be clear of the dumper.

Memory trick:

Loading? Get off and stand clear.

Find it in the book

HSE HSG144 (2nd edition, 2009), page 25

Reg HSE HSG144, Table 6

Q5. Where should barriers around an excavation in a public area preferably be placed?

Show answer

Answer: D. At least 1 m back from the edge

  • Barriers should preferably be at least 1 m from the edge of an excavation.
  • Provide guard rails and toe boards where it is possible to fall 2 m or more.

Backfill as soon as possible and avoid leaving excavations open overnight.

Why the others are wrong:

A: HSG151 prefers them set back from the edge.

B: this is not the distance HSG151 gives.

C: barriers inside the hole do not stop falls.

Memory trick:

Barrier a metre back.

Find it in the book

HSE HSG151 (2nd edition, 2009), page 18

Reg HSE HSG151, para 64

Q6. On a narrow street works site close to the public, which choice of plant helps stop people being struck during slewing?

Show answer

Answer: B. A mini excavator suited to the small site

  • Select plant suitable for the work and the site.
  • Mini-excavators may be needed on small sites to prevent the public being struck during slewing.

Use trained banksmen to supervise vehicle movements near the public.

Why the others are wrong:

A: a bigger machine has a larger slewing area.

C: a dumper is not designed for lifting.

D: a beacon does not stop people being struck.

Memory trick:

Small site, small slew.

Find it in the book

HSE HSG151 (2nd edition, 2009), page 24

Reg HSE HSG151, Road works precautions

Want 194 more CITB Highway Works questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Highway Works topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (DfT, HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic