CITB Highway Works: Core: environment practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

16 of our 200 CITB HS&E Specialist Test: Highway Works (CITB-SPEC-HIW) questions are on core: environment, about 8% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. How should rags soaked in solvent be dealt with on site?

Show answer

Answer: C. Kept apart in closed fire-resisting containers

  • Collect highly flammable waste, such as solvent-soaked rags, separately in closed fire-resisting containers.
  • Other rubbish goes in closed metal containers removed from site regularly.

Good waste control reduces both fire risk and pollution.

Why the others are wrong:

A: highly flammable waste must be kept separate from general rubbish.

B: burning waste on site creates fire and fume risks.

D: this leaves a fire risk in the open.

Memory trick:

Solvent rags: lid on, kept apart.

Find it in the book

HSE HSG150 (3rd edition, 2006), page 18

Reg HSE HSG150, para 85

Q2. You damage the wrapping on a water main while digging. What should you do?

Show answer

Answer: C. Tell the water company at once; don't repair it

  • If a water pipe or its wrapping is damaged, inform the water company (and owners of other affected services) immediately.
  • Do not make unauthorised repairs.

Leaks can affect other services and reduce support to structures.

Why the others are wrong:

A: unauthorised repairs must not be made.

B: damage to the wrapping must be reported too.

D: the water company must be told immediately.

Memory trick:

Water damage? Tell, don't tape.

Find it in the book

HSE HSG47 (3rd edition, 2014), page 31

Reg HSE HSG47, para 157

Q3. When planning how site waste will be managed, what should be decided about skips?

Show answer

Answer: D. Where they can go and how often they are collected

  • Decide how the waste stream will be managed so it is timely and effective.
  • Allow space for skips and bins, and decide where skips go and how often they are collected.

Waste also needs storing safely before it leaves site.

Why the others are wrong:

A: the plan must cover position and collection.

B: burning waste in skips is not a waste plan.

C: skips must not be left as hazards to the public.

Memory trick:

Plan the skip: spot and swap.

Find it in the book

HSE HSG150 (3rd edition, 2006), page 15

Reg HSE HSG150, para 73

Q4. How should part-used tins of solvent-based products be kept at the end of a shift?

Show answer

Answer: B. In suitable containers in a secure compound

  • Store all hazardous substances in suitable containers or secure compounds when not in use.
  • Collect and dispose of empty containers and limit the amounts kept on site.

Use water-based products instead of solvent-based ones where possible.

Why the others are wrong:

A: this exposes the public and the environment.

C: this pollutes drains and watercourses.

D: they must be stored securely, not left in public view.

Memory trick:

Lock it up, never pour it down.

Find it in the book

HSE HSG151 (2nd edition, 2009), page 20

Reg HSE HSG151, para 70

Q5. Which method reduces dust and noise when cutting paving slabs next to the public?

Show answer

Answer: C. Using a slab guillotine instead of a disc cutter

  • HSG151 suggests different work methods, eg guillotines rather than disc cutters for paving slabs.
  • Also use water suppression or extraction, and work when the public are less likely to be about.

Controls that protect the workforce often reduce nuisance to neighbours too.

Why the others are wrong:

A: a bigger cutter still creates noise and dust.

B: this is unsafe and increases dust.

D: busy times put more people near the work.

Memory trick:

Guillotine the slab, quiet and clean.

Find it in the book

HSE HSG151 (2nd edition, 2009), page 22

Reg HSE HSG151, para 76

Q6. Which measure reduces dust and noise affecting people walking past a footway works site?

Show answer

Answer: A. Solid barriers next to the public area

  • HSG151 lists controls including solid barriers next to public areas, water suppression and quieter methods.
  • Also work at times when the public are less likely to be around.

Noise and dust are a common source of complaints about street works.

Why the others are wrong:

B: open mesh does little to stop dust or noise.

C: this puts more people near the work.

D: dry cutting increases dust.

Memory trick:

Solid screen, cleaner street.

Find it in the book

HSE HSG151 (2nd edition, 2009), page 22

Reg HSE HSG151, para 76

Want 194 more CITB Highway Works questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB Highway Works topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.