103 of our 240 Installation Planning, Preparing and Designing (ELEC3-04A) questions are on selection of systems, wiring and equipment, about 43% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Regulations that come up most

The regulation groups our selection of systems, wiring and equipment questions test most often. Know where these are in your book before the exam.

  • 536 · 3 questions
  • 528.1 · 2 questions
  • 537.2 · 2 questions
  • 701.512 · 2 questions
  • 132.14 · 1 questions
  • 415.1 · 1 questions
  • 433 · 1 questions
  • 433.1 · 1 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Non-sheathed (single insulated) cables may be laid in trunking only if the trunking gives at least which degree of protection?

Show answer

Answer: B. IPXXD or IP4X

  • Trunking must provide at least IPXXD or IP4X
  • IP4X excludes solid objects over 1.0 mm, such as a thin wire

Site-fabricated joints must also be checked to meet IPXXD.

Why the others are wrong:

A: IPX4 is about splashing water, not access to live parts.

C: IP2X only protects against finger-sized objects, which is not enough.

D: this is far higher than required.

Memory trick:

Non-sheathed needs a 4 (or D).

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 168

Reg 521.10

Q2. A wall-mounted heater has an element that can be touched, such as one in a silica-glass sheath. What kind of switch is required?

Show answer

Answer: A. A double-pole switch

  • Fixed heaters connect through a fused connection with a local switch.
  • Where the element can be touched, the switch must be double pole, disconnecting all conductors.

This isolates the element fully.

Why the others are wrong:

B: single-pole switching leaves the element connected to neutral.

C: two-way switching is for lighting control from two points.

D: switching only the neutral is not acceptable.

Memory trick:

Touchable element, double-pole switch.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 133

Reg Space heating

Q3. During an EICR, PVC cables are found supported only by plastic clips across a ceiling. Which code does the book say should be recorded?

Show answer

Answer: B. C3, improvement recommended

  • 521.10.202 requires support so wiring will not prematurely collapse in a fire.
  • On existing installations with only non-metallic supports, the book says record C3.

New work needs metal clips, saddles or ties, or other fire-resistant support.

Why the others are wrong:

A: the book records this as an improvement, not immediate danger.

C: the book gives a lower code than this.

D: the condition is clear, so no investigation is needed.

Memory trick:

Plastic clips on old work: C3.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 161

Reg BS 7671 521.10.202

Q4. A protective device is to be installed where the prospective fault current is 10 kA. Which rated short-circuit capacity is acceptable?

Show answer

Answer: A. Any capacity of 10 kA or more

  • The rated short-circuit capacity of a device must be not less than the prospective fault current where it is installed.
  • With 10 kA PFC, a device rated 10 kA or above is required.

A device with too low a capacity could be destroyed or fail to clear the fault.

Why the others are wrong:

B: 6 kA is less than the 10 kA PFC, so the device could fail to interrupt it safely.

C: the capacity must not be less than the PFC.

D: an RCD does not make up for inadequate breaking capacity.

Memory trick:

Break it bigger: capacity at least equal to PFC.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 219

Reg Supply characteristics

Q5. How is the space under a bath classified if it can be reached without using a tool?

Show answer

Answer: D. Zone 1

  • Accessible without a tool: zone 1
  • Accessible only with a tool: outside the zones

Why the others are wrong:

A: this applies only if a tool is needed to reach it.

B: zone 0 is the inside of the bath or shower basin.

C: the space is classed as zone 1, not zone 2.

Memory trick:

No tool? Zone 1 rules.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 196

Reg 701.32

Q6. A fire alarm in a care home must wake sleeping residents. What minimum sound level does the book give at the bedhead?

Show answer

Answer: C. 75 dB

  • Sounders should normally produce at least 65 dB, or 5 dB above any ambient sound lasting more than 30 seconds.
  • To arouse sleeping persons the minimum is raised to 75 dB at the bedhead.
  • All sounders in one installation must be of the same type.

Sleeping people need a louder signal than those who are awake.

Why the others are wrong:

A: that rule applies to persistent background noise, not the bedhead figure.

B: that is the general minimum for sounders, not for waking sleeping people.

D: the book's bedhead figure is lower than this.

Memory trick:

Awake 65, asleep 75: add ten to wake them.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 141

Reg BS 5839

Want 234 more ELEC3/04a questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other ELEC3/04a topics

Revise this topic