Regulations that come up most

The regulation groups our planning, information and regulations questions test most often. Know where these are in your book before the exam.

  • 132.2 · 3 questions
  • 132.1 · 2 questions
  • 131.2 · 1 questions
  • 411.3 · 1 questions
  • 421.1 · 1 questions
  • 522.8 · 1 questions
  • 526.3 · 1 questions
  • 542.2 · 1 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Which item is NOT one of the supply characteristics a designer needs to obtain under Regulation 132.2?

Show answer

Answer: A. The total length of all final circuits

  • Supply details needed: voltage, earthing arrangement, Ze and the location of the supply.
  • They are obtained by inspecting the existing supply or by asking the distributor.

Final circuit lengths are a design output, decided later by the designer.

Why the others are wrong:

B: voltage is one of the first supply details to establish.

C: the system type (TN-S, TN-C-S or TT) must be known.

D: Ze is needed for every fault protection calculation.

Memory trick:

Before you design: Volts, Type, Ze, Where.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 218

Reg 132.2

Q2. An alteration is made to a three-phase installation wired in the old red, yellow, blue colours. How should the conductors be identified at the interface?

Show answer

Answer: B. Both old and new cables marked L1, L2, L3 and N

  • Three-phase alterations must be marked at the interface L1, L2, L3 and N.
  • Both new and old cables are marked, and these markings are preferred to coloured tape.
  • A caution notice is also required at the board.

This prevents confusion between old blue (a line) and new blue (neutral).

Why the others are wrong:

A: both old and new cables must be marked.

C: alphanumeric marking is preferred to coloured tape or sleeving.

D: three-phase alterations need marking as well as the notice.

Memory trick:

Old blue was a line, new blue is neutral: so label everything.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 155

Reg BS 7671 514

Q3. The local electricity company is providing a temporary supply to a new building site. How must the incoming supply cable be terminated?

Show answer

Answer: A. In a waterproof enclosure that can be locked

  • Construction sites are treated as special locations (Section 704).
  • When the supply company provides the supply, the incoming cable must be terminated in a waterproof and locked enclosure.
  • This prevents unauthorised access and protects the metering arrangements.

Sites are wet and busy, so the intake needs weather protection and security.

Why the others are wrong:

B: site office equipment is not the protected, lockable intake the book describes.

C: an open board gives no weather protection or security against interference.

D: the intake must be accessible and protected, not buried.

Memory trick:

Site intake: keep the weather out and the public out, waterproof and locked.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 191

Reg Section 704

Q4. The distributor believes a new installation has not been built to a suitable standard. What power do the supply regulations give it?

Show answer

Answer: D. It may refuse to connect the supply

  • The supply regulations let the distributor refuse to connect an installation it believes is not to a high enough standard.
  • In practice this is enforced where the installation does not meet BS 7671.

This is another reason to work to the IET Regulations.

Why the others are wrong:

A: the regulations do not give the distributor powers to fine.

B: the distributor does not carry out the consumer's installation work.

C: it is not obliged to connect an installation it considers unsafe.

Memory trick:

Unsafe install? No supply.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 121

Reg ESQCR 2002

Q5. In the Electricity at Work Regulations, what is the difference between an 'absolute' duty and one that is 'reasonably practicable'?

Show answer

Answer: A. Absolute ignores cost; reasonably practicable weighs risk against cost

  • Absolute: must be met irrespective of time or cost.
  • Reasonably practicable: the duty holder balances the risk against the cost and difficulty of the safeguards.

Knowing which applies tells you how much discretion the duty holder has.

Why the others are wrong:

B: both terms describe how strict a duty is, not who it applies to.

C: the terms are not tied to whether a system is live or dead.

D: both are legal duties; absolute is the stricter of the two.

Memory trick:

Absolute = no excuses; practicable = weigh it up.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 114

Reg EWR 1989

Q6. Under the rules described for new dwellings of up to two storeys, where should mains-operated smoke alarms normally be fitted?

Show answer

Answer: B. On circulation space ceilings, 300 mm from walls, on every storey

  • Fit in circulation spaces, at least one per storey
  • Ceiling-mounted, at least 300 mm from walls
  • Interlinked so one triggers all
  • Mains powered

Where a kitchen is not separated by a door, a heat alarm is added.

Why the others are wrong:

A: they normally go on the ceiling in circulation spaces.

C: 300 mm is the figure and every storey needs one.

D: kitchens open to circulation need a heat alarm and supplies are mains.

Memory trick:

Ceiling, 300 mm off the wall, every floor, all linked.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 187

Reg Building Regulations, smoke alarms

Want 234 more ELEC3/04a questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other ELEC3/04a topics

Revise this topic