Working at Height: Roof work, fragile surfaces and falling objects practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

30 of our 120 Working at Height Awareness (WAH-AWARE) questions are on roof work, fragile surfaces and falling objects, about 25% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. On a tiled pitched roof, how should roof workers move across it?

Show answer

Answer: D. On a properly secured roof ladder or staging

  • On sloping roofs, workers should not work directly on tiles or slates.
  • Use roof ladders and proprietary staging, designed for the purpose, properly supported and secured with a ridge hook.

Tile and slate coverings are not designed to be walked on.

Why the others are wrong:

A: battens deteriorate and are only footholds under strict conditions.

B: ridge capping can break away and offers no secure footing.

C: workers should not work directly on tiles or slates.

Memory trick:

Tiles are for rain, not for feet.

Find it in the book

HSE HSG150 (3rd edition, 2006), page 46

Reg HSE HSG150 (2006), para 237; HSG33, para 161

Q2. Fragile roof lights sit 1 m from a valley gutter that is used regularly for access. What does HSG33 advise?

Show answer

Answer: C. Permanently protect the roof lights

  • Roof lights should not extend within 2 m of valley gutters.
  • Where they already do and access is needed, consider permanently protecting them.
  • For regular access along gutters, permanent, collective protection (eg fixed covers) is preferred over running lines.

One slip from a narrow gutter onto a roof light can be fatal.

Why the others are wrong:

A: dry weather doesn't make fragile roof lights safe.

B: this does nothing to stop a fall through the roof lights.

D: marking them doesn't stop someone falling through.

Memory trick:

Gutter route near lights? Cover them for good.

Find it in the book

HSE HSG33 (5th edition, 2020), page 44

Reg HSE HSG33 (2020), paras 197 to 199

Q3. At the end of each working day on a roof job, what should be checked?

Show answer

Answer: D. That loose sheets, offcuts and fixings are secured

  • Inspect sites at the end of the working day to make sure loose materials, especially sheets, offcuts and fixings, are not left unsecured on the roof.

Wind overnight can blow loose sheets off the roof onto people below.

Why the others are wrong:

A: this is not the end-of-day check HSG33 describes.

B: the check is about securing loose materials.

C: edge protection should stay in place for the full job.

Memory trick:

Tie it down before you go home.

Find it in the book

HSE HSG33 (5th edition, 2020), page 19

Reg HSE HSG33 (2020), para 68

Q4. A scaffold platform is provided at eaves level. How far below the eaves is it recommended to be, at most?

Show answer

Answer: D. 300 mm

  • An eaves-level scaffold platform gives edge protection, a working platform and storage space.
  • It should be as close as possible to the eaves, no more than 300 mm below eaves level.
  • Brick guards are needed if slates are stacked above toe board height.

The closer the platform, the shorter any slide off the roof.

Why the others are wrong:

A: this is twice the recommended maximum.

B: 950 mm is the guard rail height, not this distance.

C: 1 m is how far a ladder should extend above a landing.

Memory trick:

Eaves platform: within 300.

Find it in the book

HSE HSG33 (5th edition, 2020), page 38

Reg HSE HSG33 (2020), para 157

Q5. What counts as short-duration roof work?

Show answer

Answer: B. Low-risk tasks measured in minutes, not hours

  • To be 'short-duration' the task must be assessed as low-risk and take a short time, measured in minutes rather than hours.
  • Examples: inspection, replacing a few tiles, adjusting a TV aerial.
  • It must still be risk assessed with suitable precautions.

A short job on a roof is still dangerous.

Why the others are wrong:

A: a full day is not short duration; it is measured in minutes.

C: the number of people does not decide this.

D: access method has nothing to do with duration.

Memory trick:

Minutes, not hours.

Find it in the book

HSE HSG33 (5th edition, 2020), page 29

Reg HSE HSG33 (2020), para 115; HSG150, para 238

Q6. Why can old roof lights be hard to spot on a roof?

Show answer

Answer: B. They may be painted or weathered to match the roof

  • Roof lights discolour with age, may be painted to reduce glare, or obscured by dirt, debris or vegetation.
  • External insulation may also hide them.

If in doubt, assume there is a fragile roof light there.

Why the others are wrong:

A: there is no such rule about where roof lights go.

C: position is not the reason they are hard to see.

D: many old roof lights have no protection at all.

Memory trick:

Can't see it? Assume it's there.

Find it in the book

HSE HSG33 (5th edition, 2020), pages 26 and 43

Reg HSE HSG33 (2020), paras 102 and 184

Want 114 more Working at Height questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other Working at Height topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic