Q1. Concrete is about to be poured into wall formwork. What does HSG150 say must be checked first?
Show answer
Answer: A. That formwork and supports are tied, footed, braced and supported
- Formwork, falsework and temporary supports must be checked, tied, footed, braced and supported before loading and before pouring walls or columns.
- Loads should be spread evenly, not concentrated.
Collapse of formwork is one of the main risks listed.
Why the others are wrong:
B: the safety check is on the temporary works, not just the mix.
C: release oil is a quality matter, not a stability check.
D: back-propping may be needed; removing it is not a pre-pour check.
Memory trick:
Brace before the pour.
Find it in the book
HSE HSG150 (3rd ed), page 51