CITB HS&E Managers: High-risk activities practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

72 of our 300 CITB Health, Safety and Environment Test: Managers and Professionals (CITB-HSE-MAP) questions are on high-risk activities, about 24% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. Concrete is about to be poured into wall formwork. What does HSG150 say must be checked first?

Show answer

Answer: A. That formwork and supports are tied, footed, braced and supported

  • Formwork, falsework and temporary supports must be checked, tied, footed, braced and supported before loading and before pouring walls or columns.
  • Loads should be spread evenly, not concentrated.

Collapse of formwork is one of the main risks listed.

Why the others are wrong:

B: the safety check is on the temporary works, not just the mix.

C: release oil is a quality matter, not a stability check.

D: back-propping may be needed; removing it is not a pre-pour check.

Memory trick:

Brace before the pour.

Find it in the book

HSE HSG150 (3rd ed), page 51

Reg HSE HSG150, para 263

Q2. A contractor's engineer designs temporary propping to hold up a façade during alterations. What is their status under CDM 2015?

Show answer

Answer: A. They are a designer, as temporary works design counts

  • L153: a designer is anyone who prepares or modifies a design, including the design of temporary works.
  • Contractors who design temporary works also have designer duties.

L153 para 148 says contractors who do design work, including temporary works, have designer duties.

Why the others are wrong:

B: L153 includes the design of temporary works.

C: designer status depends on preparing a design, not on qualifications.

D: the client appoints the principal designer.

Memory trick:

Design a prop, you're a designer.

Find it in the book

HSE L153 (CDM 2015), page 26

Reg HSE L153, para 72

Q3. A MEWP arrives from a hire company. What must you make sure of before it is used?

Show answer

Answer: C. It comes with an indication of when it was last thoroughly examined

  • Before using equipment such as a MEWP from another business or rental company, make sure it comes with an indication of when the last thorough examination was done.
  • HSG150 also asks for a current report of thorough examination.

The indication must be clear to everyone involved.

Why the others are wrong:

A: HSE does not inspect hired equipment before use.

B: INDG401 sets no age limit.

D: this is not the INDG401 requirement for hired equipment.

Memory trick:

Hired MEWP: see the exam date before you go up.

Find it in the book

HSE INDG401, page 5

Reg HSE INDG401, 'How do you make sure the equipment itself is in good condition?'

Q4. Your excavation plan must include an emergency plan for damage to buried services. What does HSG150 say it must include if a gas pipe is damaged?

Show answer

Answer: A. Ban smoking and naked flames, and evacuate, including nearby properties

  • Have a system for notifying the service owner in all cases.
  • For gas: ban smoking and naked flames, evacuate where necessary (including nearby properties) and put up warning signs.

Gas can track underground into buildings and ignite.

Why the others are wrong:

B: the plan is to notify the service owner, not to operate their network.

C: this does not deal with the escaping gas.

D: warnings and evacuation must not wait.

Memory trick:

Gas hit: no flames, get people out.

Find it in the book

HSE HSG150 (3rd ed), page 76

Reg HSE HSG150, para 378

Q5. A safety net under a roof has arrested a worker's fall. What does HSG150 say should happen?

Show answer

Answer: C. The net installer should be consulted

  • Nets need inspecting after installation, a handover certificate, then weekly inspection.
  • When a net has been used to arrest a fall, the net installer should be consulted.

Enough clearance below the net is needed for it to deform.

Why the others are wrong:

A: the net deforms when absorbing a fall, so it needs checking.

B: the installer should be consulted after a fall, not at the next routine check.

D: nets are a valid control; the installer should be consulted.

Memory trick:

Net caught someone? Call the rigger.

Find it in the book

HSE HSG150 (3rd ed), page 39

Reg HSE HSG150, para 197

Q6. A groundworks contractor plans to put a diesel compressor at the edge of a deep excavation. What does HSG150 advise?

Show answer

Answer: A. Keep it away, as exhaust gases can collect in the excavation

  • Do not site petrol or diesel equipment such as generators or compressors in or near the edge of an excavation.
  • Exhaust gases can collect; engines used in excavations need fumes ducted away or forced ventilation.

Excavations can behave like confined spaces.

Why the others are wrong:

B: a banksman does not stop exhaust gases collecting.

C: dust masks do not protect against exhaust gases.

D: HSG150 gives no time allowance; do not site it there.

Memory trick:

Engines away from the edge.

Find it in the book

HSE HSG150 (3rd ed), page 74

Reg HSE HSG150, para 357

Want 294 more CITB HS&E Managers questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CITB HS&E Managers topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic