CDM 2015: CDM 2015 overview and when it applies practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

30 of our 120 CDM 2015 Awareness (CDM-AWARE) questions are on cdm 2015 overview and when it applies, about 25% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. A small project does not need to be notified to HSE. Does CDM 2015 still apply to it?

Show answer

Answer: B. Yes, it applies whether or not it is notifiable

  • L153 reminds readers that the requirements of CDM 2015 apply whether or not the project is notifiable.
  • Notification only adds the duty to send a notice to HSE.

Small jobs still need planning, information and welfare.

Why the others are wrong:

A: the whole of CDM 2015 applies, not just the site rules in Part 4.

C: notification is one duty among many; the rest still apply.

D: single-contractor projects with no principal contractor are still covered.

Memory trick:

Notified or not, CDM still applies.

Find it in the book

HSE L153 (CDM 2015), page 21

Reg HSE L153, para 52

Q2. Which of these is listed in L153 as a key element of securing health and safety in construction?

Show answer

Answer: C. Consulting and engaging with workers

  • Key elements include: applying the general principles of prevention; appointing the right people at the right time; information, instruction, training and supervision; cooperation and coordination.
  • And consulting workers and engaging with them.

Workers often spot risks managers miss.

Why the others are wrong:

A: the key elements include cooperation and communication between dutyholders.

B: planning and managing risk comes before relying on PPE.

D: price alone is not a key element; capability is what matters.

Memory trick:

Ask the people doing the job.

Find it in the book

HSE L153 (CDM 2015), page 7

Reg HSE L153, para 4(e)

Q3. A small building firm also produces the design for a job. Can one firm hold more than one CDM dutyholder role?

Show answer

Answer: D. Yes, if it has the skills and capability for each role

  • Organisations or individuals can carry out the role of more than one dutyholder.
  • They need the skills, knowledge, experience and (if an organisation) the organisational capability for each role.

A design and build contractor is a common example.

Why the others are wrong:

A: no HSE consent is needed to hold more than one role.

B: L153 allows one organisation to carry out more than one role.

C: this applies to all projects, not just domestic work.

Memory trick:

One firm, two hats, if it can wear both.

Find it in the book

HSE L153 (CDM 2015), page 7

Reg HSE L153, Table 1 footnote

Q4. Emergency arrangements, including evacuation, have been drawn up for a large site. What does CDM 2015 also require?

Show answer

Answer: C. People know them and they are tested in practice

  • Arrangements for any foreseeable emergency must include procedures for evacuation where necessary.
  • Everyone they cover must be familiar with them, and they must be tested by being put into effect at suitable intervals.

A drill shows up problems before a real emergency does.

Why the others are wrong:

A: filing them away does not make people familiar with them.

B: they must be tested at suitable intervals, not left until something goes wrong.

D: every person the arrangements cover must be familiar with them.

Memory trick:

Know the plan, practise the plan.

Find it in the book

HSE L153 (CDM 2015), page 56

Reg CDM 2015, reg 30(1) and (3) (HSE L153)

Q5. Under CDM 2015, which of these counts as a 'structure'?

Show answer

Answer: A. A scaffold used for access during the work

  • 'Structure' includes buildings, roads, pipelines, sewers and much more.
  • It also includes formwork, falsework, scaffold or other structures used for support or access during construction work.

So putting up and striking scaffold is construction work.

Why the others are wrong:

B: vehicles are not listed as structures in the definition.

C: a radio is not a structure under the definition.

D: stored materials are not a structure.

Memory trick:

Scaffold holds you up, so it counts as a structure.

Find it in the book

HSE L153 (CDM 2015), page 12

Reg CDM 2015, reg 2(1) 'structure' (c) (HSE L153)

Q6. So far as reasonably practicable, how should a construction site and its approaches be lit?

Show answer

Answer: D. By natural light

  • Each construction site, approach and traffic route must have suitable and sufficient lighting.
  • So far as reasonably practicable, this must be by natural light.
  • Secondary lighting is needed where failure of artificial lighting would be a risk.

Artificial light must not change how safety signs look.

Why the others are wrong:

A: artificial light is used where needed, but natural light comes first.

B: lighting must be suitable and sufficient, not left to individuals.

C: emergency lighting is for routes and exits, not general site lighting.

Memory trick:

Daylight first, lamps second.

Find it in the book

HSE L153 (CDM 2015), page 58

Reg CDM 2015, reg 35(1) (HSE L153)

Want 114 more CDM 2015 questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other CDM 2015 topics

Free official guides for this topic

Our questions are written from these documents. Download them free to revise from the source.

© Crown copyright (HSE). Unchanged copies, reproduced under the Open Government Licence v3.0. FreeMocks is not connected to or endorsed by HSE or the government.

Revise this topic