QELTK3/002: Electricity-producing technologies practice questions

Written by Acacio Oliveira, founder of FreeMocks, plumbing and heating engineer (F-Gas registered).

46 of our 150 Environmental Legislation and Technologies (QELTK3-002) questions are on electricity-producing technologies, about 31% of the bank. Try 6 below with full worked answers, then practise the rest in a timed mock.

Regulations that come up most

The regulation groups our electricity-producing technologies questions test most often. Know where these are in your book before the exam.

  • 712.410 · 2 questions
  • 712.431 · 2 questions
  • 712.433 · 2 questions
  • 826.1 · 2 questions
  • 514.15 · 1 questions
  • 551.7 · 1 questions
  • 712.531 · 1 questions
  • 712.534 · 1 questions

Practice questions

Pick an answer to see why it's right, why the others are wrong, and the page in the book.

Q1. When would roof-mounted solar PV on a house need planning permission, according to the text?

Show answer

Answer: B. When the building is listed or in a conservation area

  • Solar PV comes within permitted development.
  • Planning is needed if the building is listed or in a conservation area.

The same applies to solar thermal.

Why the others are wrong:

A: south facing is normal and allowed.

C: no such size limit is given for planning.

D: a smart meter does not affect planning.

Memory trick:

Listed or conserved? Ask first.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 33

Reg AC 3.3 Solar PV

Q2. The Archimedes screw at New Mills produces about 130,000 kWh a year, enough for 40 homes. On average, how much electricity does that allow per home per year?

Show answer

Answer: B. 3,250 kWh

  • Per home = 130,000 ÷ 40 = 3,250 kWh a year.
  • The Old Torr Mill screw is 2.4 m in diameter and weighs 12 tonnes.

A useful sense check on typical household use.

Why the others are wrong:

A: from multiplying instead of dividing.

C: a factor of ten too low.

D: a factor of ten too high.

The maths

Per home = total / number of homes
= 130,000 / 40
= 3,250 kWh a year

Memory trick:

Total ÷ homes = per home.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 24

Reg AC 3.2 Hydro

Q3. A grid-connected PV system has an output under 16 A per line. Which is one condition for exemption from some ESQCR requirements?

Show answer

Answer: A. The distributor is told before or at the time of commissioning

  • Under 16 A per line, exemption conditions are:
  • equipment type tested and approved
  • installation complies with BS 7671
  • PV disconnects from the network on a network fault
  • distributor advised before or at commissioning

ESQCR compliance is mandatory.

Why the others are wrong:

B: waste carrier registration has nothing to do with ESQCR connection rules.

C: it is grid-connected by definition.

D: PV doesn't generate at night.

Memory trick:

Under 16 A: tell the DNO by switch-on day.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 20

Reg ESQCR 2006

Q4. A micro-hydro scheme receives 9 kW of water power in winter. In a dry summer the discharge drops to 40% of the winter flow, with the same head. Using the text's coupling efficiency, what mechanical power reaches the generator in summer?

Show answer

Answer: C. 3.24 kW

  • Power is proportional to the discharge (flow) and the head.
  • Summer water power = 9 x 0.4 = 3.6 kW.
  • Small turbines reach about 90% mechanical efficiency at the coupling: 3.6 x 0.9 = 3.24 kW.

The watercourse must have enough flow and head through the seasons.

Why the others are wrong:

A: this applies the efficiency but forgets the drop in flow.

B: this is the summer water power, before applying the 90% coupling efficiency.

D: this uses a 40% reduction (60% of flow) instead of 40% of flow.

The maths

Summer water power = 9 x 0.40 = 3.6 kW
Mechanical power = 3.6 x 0.90 = 3.24 kW

Memory trick:

Scale by flow, then take 90%.

Find it in the book

Linsley, Electrical Installation Work Level 3 (EAL Edition), page 24

Reg Hydro microgenerators (text)

Q5. An electrician switches off the AC isolator for a domestic PV inverter in daylight before replacing a DC connector on the roof. What must they assume about the DC side?

Show answer

Answer: D. It is still energized

  • Electrical equipment on the DC side shall be considered to be energized, even when the AC side is disconnected from the grid or the inverter is disconnected from the DC side.

PV modules produce voltage whenever there is light, so the DC isolator and safe working procedures are needed.

Why the others are wrong:

A: PV modules generate from daylight, not from the grid.

B: the DC side is fed by the modules whenever light falls on them.

C: a blank display does not mean the DC cables are dead.

Memory trick:

Sun up, DC live.

Find it in the book

BS 7671:2018+A4:2026, page 314

Reg 712.410.101

Q6. A PV array has three strings in parallel. Each string has Isc max of 12 A and the module maximum overcurrent protection rating is 25 A. Is string overcurrent protection required?

Show answer

Answer: B. No, because 33.75 A is not less than 24 A

  • With more than two strings, protection is needed where 1.35 x I(MOD_MAX_OCPR) < (Ns - 1) x Isc max.
  • 1.35 x 25 = 33.75 A.
  • (3 - 1) x 12 = 24 A.
  • 33.75 A is not less than 24 A, so string protection is not required.

With one or two strings, no overcurrent protective device is required at all.

Why the others are wrong:

A: three or more strings need it only when the stated condition is met.

C: this is not the test; compare 1.35 x the module rating with (Ns - 1) x Isc max.

D: the number of inverters is not the condition given.

The maths

Left side = 1.35 x 25 = 33.75 A
Right side = (3 - 1) x 12 = 24 A
33.75 < 24 is false, so no string protection needed

Memory trick:

Reverse current from the others must beat 1.35 x module rating.

Find it in the book

BS 7671:2018+A4:2026, page 315

Reg 712.431.101

Want 144 more QELTK3/002 questions? Start a free timed mock.

Start a free mock

Full mock, no card needed. Full workouts on the first 5 questions.

Other QELTK3/002 topics

Revise this topic