Q1. After the existing radiator circuit has been flushed and cleaned during a heat pump retrofit, which other items does the example commissioning checklist ask you to record for the heating system?
Show answer
Answer: A. Cleaner used, strainers or filters clear, and water treated
- The central heating section includes:
- HTG system flushed and cleaned, and cleaner used
- Strainers/filters clear
- HTG system water treated, and inhibitor/antifreeze used
- system purged of air
Old systems hold sludge that will quickly block a heat pump's plate heat exchanger and filters if it is not removed.
Why the others are wrong:
B: these are boiler commissioning checks, not heat pump heating circuit items.
C: refractometer checks apply to ground loop antifreeze, not the radiator circuit.
D: this is not a measurement on the checklist.
Memory trick:
Clean it, check the strainer, dose it.
